论文部分内容阅读
官陂电站是座引水式电站,取水口以上集雨面积108平方公里,引水渠道4.97公里,设计净水头184米,水轮机型号:CJ22-W-90/1×11,单机流量0.57米~3/秒,发电机型号:TSWN143/44-10.原设计总装机4×800千瓦.第一、二台机组于1965年底投产,1971年三、四号机投产.从1972年至1978年,经过七年运行,年平均出力为2602千瓦,平均年发电量2279万度,平均年利用小时7120小时,比原设计都超过69.6%.实践说明水利资源未能充分利用,于1979年底再扩建二台同类型机
Guantan Hydropower station is a water diversion station, water intake above the catchment area of 108 square kilometers, diversion channel 4.97 km, the design of water head 184 meters, turbine type: CJ22-W-90/1 × 11, single flow 0.57 m ~ 3 / Second, the generator model: TSWN143 / 44-10. The original design of the total installed capacity of 4 × 800 kilowatts. The first and second units put into operation in late 1965, three or four aircraft went into operation in 1971. From 1972 to 1978, After seven years of operation, the average annual output of 2602 kilowatts, the average annual generating capacity of 22.79 million degrees, the average annual utilization hours of 7120 hours, more than the original design of more than 69.6%. Practice shows that water resources have not been fully utilized, and then expanded by the end of 1979 II Taiwan the same type of machine