论文部分内容阅读
经过一段时期大跨越发展,截至2015年底,我国风电累计并网装机容量达到1.45362亿千瓦。随着我国风电产业发展的快速推进,在政策环境、市场环境、资源质量、并网消纳、电价下调预期等方面出现了新的形势,各发电企业在风电项目开发规模、建设安排等方面遇到了新的挑战。新时期,各发电企业风电开发须转变前期建设模式,采取“大项目”、“建投并进”、“轻资产”等策略适应环境变化,降低投资风险。
After a period of great leap forward development, as of the end of 2015, China’s wind power installed capacity reached 145.362 million kilowatts. With the rapid development of wind power industry in our country, a new situation has emerged in the aspects of policy environment, market environment, resource quality, grid integration and consumption reduction, expectation of price reduction. In the case of various power generation enterprises in the scale of wind power project development and construction arrangement, To new challenges. In the new period, the wind power development of various power generation enterprises should change the mode of pre-construction and adopt the strategies of “big project”, “merged with construction investment” and “light asset” to adapt to environmental changes and reduce the investment risk.