论文部分内容阅读
铁路19个续建项目列入1989年第一批国家重点工程这些项目是:焦枝复线,候月线,宣杭线,沈阳枢纽,滨绥线(含哈尔滨枢纽),沪杭复线及钱塘江大桥、杭州枢纽,唐山机车车辆厂,大包复线,浙赣复线,高阜线,陇海线(含郑宝电气化、徐州至连云港段技术改造)以及湘黔线、京广线、贵昆线、忘厦线、川黔线、大秦线电气化工程(均含电气化铁道的供电工程。
The 19 railroad continued construction projects included in 1989 the first batch of national key projects These projects are: Jiaoji double line, waiting line, Xuan Hang line, Shenyang hub, Bin Sui line (including Harbin hub), Shanghai-Hangzhou double-track and the Qiantang River Bridge, Hangzhou Hub, Tangshan Locomotive and Rolling Stock Plant, Dabao Double Line, Zhejiang-Jiangxi Double Line, Gaofu Line, Longhai Line (including Zhengbao Electrification, Technical Transformation from Xuzhou to Lianyungang Section) and Xiangqian Line, Jingguang Line and Gui-Kun Line , Forgot to Xiamen line, Sichuan-Guizhou line, Daqin line electrification projects (including electrified railway power supply project.