张厚瑜福建省电力试验研究院水工专业员工获选理由:先后对棉花滩、白沙、周宁、芹山等水电厂调速器进行现场技术监督评价工作,针对各电厂调速器现有状况提出评价指导意见;负责完成华安水电厂4号调速器改造后机组甩负荷试验,棉花滩电厂1号机组大修后调速器动态特性试验及安砂电厂2号机组调速器动态性能试验;配合中调对水口电厂振荡事件进行分析等。
Zhang Houyu Fujian Electric Power Research Institute Hydraulic Engineering staff selected reasons: one after another on the cotton beach, Baisha, Zhou Ning, Qushan hydropower plant governor on-site technical supervision and evaluation work, the governor for each plant status quo Evaluation guidelines; Responsible for the completion of Huaan hydropower plant on the 4th governor unit load shedding load test, the cotton mill power plant unit overhaul after the governor dynamic characteristics of the test and safety unit No. 2 An Sha power plant governor dynamic performance test; with Middle tune on the outlet power plant oscillation event analysis.