摘要:施工进度是建筑工程项目管理三大控制重点之一,与工程质量、工程成本相有机结合形成一个反应工程项目实施状况的综合性指标,因此建筑工程施工进度管理已经不仅是传统意义上的工期控制,而是一项涉及面广、影响因素多的系列性管理活动,直接影响着施工企业的经济效益和社会效益,如何有效控制施工进度,是当前众多施工企业所需要考虑的一个重要问题。
关键词:建筑;施工;进度管理;标准设定
Abstract: The construction progress is one of the key construction project management of the three control, and the construction cost of engineering quality, combined with the status of implementation of comprehensive index of a reaction engineering project, so the construction progress management of construction engineering is not only the traditional sense of time control, but a series of extensive management activities, influence factors, directly affects the construction enterprise economic benefit and social benefit, how to effectively control the construction schedule, is an important problem in the current many construction firms need to consider.
Key words: construction; construction; schedule management; standard setting
中图分类号:TU71 文献标识码: 文章编号
引言:工程施工的进度目标能否顺利实现,不仅体现了施工单位项目管理水平的高低,对工程项目的经济效益也有很大影响。工程进度管理主要是根据施工组织设计中确定的施工进度计划进行全面的和综合性的管理工作,确保工程建设顺利进行,将项目的计划工期控制在事先确定的目标工期范围之内,在兼顾费用、质量控制目标的同时,努力缩短建设工期。
一、工程项目施工过程的综合性管理及进度控制必要性分析
在工程项目施工过程中,需要建立综合管理系统,以便实现对整个项目的一体化管理,应以建设项目的全过程管理作为研究对象,把项目管理所涉及的六大职能管理--成本、进度、质量、安全、合同和文档信息有机的结合在一起,使其成为一个相互联系的整体,利用集成的优势优化项目管理的全过程。
本文具体讨论进度管理及其控制方法,进度管理及其控制时整个建筑施工过程最为重要的一环,这是由于进度控制的重要性所决定的。
进度计划作为项目实施的主线,在科学的工作分解结构基础上必须分配并组织项目的人工、材料、设备、资金、技术等资源,安排项目的质量、安全、现场的控制措施,并将成本结构及指标分解到进度计划的各个工作中,通过进度计划完成情况的检查与分析,优化资源调配,确保项目进度计划的执行,控制成本支出。
二、工程项目进度管理标准的设定 1、以预期利润标准确定目标工期
在市场经济条件下,施工企业总是要以承包一项工程任务可以取得的预期利润为判断准绳,以决定是否参与这项工程的投标竞争。而一旦取得了工程承包合同,施工企业将动用其技术管理力量并全面投入人力、物力、财力从事施工生产活动,直至最终形成质量合格的建筑产品,其目的就是为了实现上述预期利润,但它并不是一个与工程进度无关的孤立过程。事实上施工企业不能在工程项目的建造过程中保持其必要的施工进度水平则可能引起企业生产流动资金超期占用、利息增加、人员工资和机械使用费用加大,以及向业主支付误期损失费等现象的发生,从而导致企业在该工程建设项目上的预期利润无法实现。2、以费用工期标准确定目标工期
施工企业在确定目标工期时往往并非只是单纯求快。由于工程进度过快,将会因为赶工增员或采用超常技术措施或大量使用机械化设备从而造成工程总费用的不合理支出,施工企业常常在工程进度管理过程中努力追求一个费用最低工期并以其作为目标工期。在这里,目标工期的“工期短”、“费用低”两重属性成为工程项目管理的一个复合性控制标准。事实上,由于工程费用中的直接工程费随着工期缩短而增加,其间接费却随着工期缩短而减少,这样在工期取不恰当的情况下,直接工程费和间接费之和的工程费用将会较少:工程网络计划技术中将寻求这一恰当工期的过程称为工期费用优化,相应使工程费用达到最小取值的该恰当工期则被称为“费用最低工期”。 3、以资源工期标准确定目标工期
工程项目进度管理过程中,施工企业的进度计划将根据施工过程中实际可以调配的劳动力、施工机具设备、建筑材料、构配件、半成品、资金的具体状况决定。为此,企业时常面临的一个重要问题是在资源供给受限的情况下如何使工期达到最短。这一问题的实际解决过程便是施工企业确定目标工期的过程。因此“资源限定”和“工期最短”的两重属性同样构成了工程项目进度管理的一个复合性控制标准。施工企业将其作为工程项目进度管理中的目标工期能够最大限度地避免工程建造过程中由于一种或多种建设资源供给受限而导致的工程延誤,从而保证企业不致因此陷入被动。
针对建设项目的进度目标进行施工进度控制工程进度目标按期实现的前提是要有一个科学合理的进度计划。根据工程建设项目的规模、工程量与工程复杂程度,建设单位对工期和项目投产时间的要求,资金到位计划和实现的可能性,主要进场计划,进行科学分析后,制定出工程建设项目最佳的施工工期。工程施工进度控制就是根据进度目标确定实施方案,在施工过程中进行控制和调整,以实现进度控制的目标,具体的讲,进度控制的任务是进行进度规划、进度控制和进度协调。要完成好这个任务,应做好三项工作:第一、制定工程建设项目总进度目标和总计划;第二、要对进度进行控制,必须对建设项目进展的全过程,对计划进度与实际进度进行比较;第三、进度协调的任务是对整个建设项目中各安装、土建等施工单位、总包单位、分包单位之间的进度搭接,在时间、空间交叉上进行协调。施工进度计划是施工进度控制的依据。因此编制施工进度计划以提高进度控制的质量成为进度控制的关键问题。
四、工程进度的保证措施
1、施工组织保证
项目经理部管理人员及主要技术人员应由有类似施工经验的人员组成,为保证实现工期目标,应保证本工程所需的人力、物资、设备等,并迅速组织劳动力、设备、材料进场。在合同签署后,项目主要管理人员及时到位,并组织现场调查,编制实施性施工组织设计,同时加强与地方和当地群众的联系,争取当地居民的理解和支持,为工程施工创造良好外部环境,保证施工顺利进行。工程项目开工前,结合现场施工条件,安排临时设施并作好各项施工准备,编制本工程重难点工程施工方案,并及时报请监理工程师审核批准,尽量缩短施工准备时间,确保早进场、早开工。施工过程中搞好标准化施工,按质量管理体系,根据施工进度编制“月、旬、周”施工作业计划,合理安排工序,实现平行流水作业,加快施工进度。
2、物资保证
为了保证工程进度,每道工序所需的材料、构件、配件应事先做好准备,并做好各种物资的质量检验、试验、见证取样复试等工作。根据工程进度计划,施工单位应有相应的物资采购计划,材料的订货合同中,除质量要去外,应有供货时间、地点的条款,对某些材料、设备的供应,尚应考虑到对生产猖撅的考察和某些材料所需要的自然干燥时间,而提前做好订货。当然在材料、设备订货问题上,建设单位在资金上应给予保证,以取保工程能按计划进度展开,避免因材料供应问题而影响进度。
3、设备保证
施工机械对施工的效率有决定性作用,直接影响工程进度。
3.1在施工准备时就应按施工进度计划安排各种机械的使用时间,并做好主要机械设备的计划表。
3.2选择机械性能好、工作效率高的机械设备进场,特殊大型设备进场应考虑运输路线,如需道路管理协调的,更应提前准备。
3.3投入现场各种施工设备都应有上级主管部门的安检证明,操作人员必须持证上岗,并进行必要的技能培训和安全教育。实行岗位责任制,严格按操作规程作业,以保证机械的正常使用与安全。
3.4施工现场设立专业机械维修组,搞好机械设备的保养与维修,保证机械设备的完好率达到100%,随时具备施工状态。
3.5按主要机械计划,机械设备提前进场做为施工准备工作。
五、结束语
建筑工程施工进度控制的目标是为了实现项目建设工期,必须通过行之有效的控制与管理,充分把握研究影响进度的各种因素,针对施工进度控制存在的问题采取相应措施,主动积极的对施工进度进行控制,在工程项目实施过程中,进度控制就是经过不断地计划、执行、检查、分析和调整的动态循环,因此做好施工进度的计划与衔接,跟踪检查施工进度计划的执行情况,在必要时进行调整,在保证工程质量的前提下,确保工程建设进度目标的实现。
参考文献:
[1]郭军义.浅议工程项目进度控制.科技创新导报,2008,27:95.
[2] 蔡荣洲.对建筑工程施工进度管理的几点思考[J].华章,2011(22)
[3]欧春花.浅谈工程施工进度管理.山西建筑,2008,34(8).
关键词:建筑;施工;进度管理;标准设定
Abstract: The construction progress is one of the key construction project management of the three control, and the construction cost of engineering quality, combined with the status of implementation of comprehensive index of a reaction engineering project, so the construction progress management of construction engineering is not only the traditional sense of time control, but a series of extensive management activities, influence factors, directly affects the construction enterprise economic benefit and social benefit, how to effectively control the construction schedule, is an important problem in the current many construction firms need to consider.
Key words: construction; construction; schedule management; standard setting
中图分类号:TU71 文献标识码: 文章编号
引言:工程施工的进度目标能否顺利实现,不仅体现了施工单位项目管理水平的高低,对工程项目的经济效益也有很大影响。工程进度管理主要是根据施工组织设计中确定的施工进度计划进行全面的和综合性的管理工作,确保工程建设顺利进行,将项目的计划工期控制在事先确定的目标工期范围之内,在兼顾费用、质量控制目标的同时,努力缩短建设工期。
一、工程项目施工过程的综合性管理及进度控制必要性分析
在工程项目施工过程中,需要建立综合管理系统,以便实现对整个项目的一体化管理,应以建设项目的全过程管理作为研究对象,把项目管理所涉及的六大职能管理--成本、进度、质量、安全、合同和文档信息有机的结合在一起,使其成为一个相互联系的整体,利用集成的优势优化项目管理的全过程。
本文具体讨论进度管理及其控制方法,进度管理及其控制时整个建筑施工过程最为重要的一环,这是由于进度控制的重要性所决定的。
进度计划作为项目实施的主线,在科学的工作分解结构基础上必须分配并组织项目的人工、材料、设备、资金、技术等资源,安排项目的质量、安全、现场的控制措施,并将成本结构及指标分解到进度计划的各个工作中,通过进度计划完成情况的检查与分析,优化资源调配,确保项目进度计划的执行,控制成本支出。
二、工程项目进度管理标准的设定 1、以预期利润标准确定目标工期
在市场经济条件下,施工企业总是要以承包一项工程任务可以取得的预期利润为判断准绳,以决定是否参与这项工程的投标竞争。而一旦取得了工程承包合同,施工企业将动用其技术管理力量并全面投入人力、物力、财力从事施工生产活动,直至最终形成质量合格的建筑产品,其目的就是为了实现上述预期利润,但它并不是一个与工程进度无关的孤立过程。事实上施工企业不能在工程项目的建造过程中保持其必要的施工进度水平则可能引起企业生产流动资金超期占用、利息增加、人员工资和机械使用费用加大,以及向业主支付误期损失费等现象的发生,从而导致企业在该工程建设项目上的预期利润无法实现。2、以费用工期标准确定目标工期
施工企业在确定目标工期时往往并非只是单纯求快。由于工程进度过快,将会因为赶工增员或采用超常技术措施或大量使用机械化设备从而造成工程总费用的不合理支出,施工企业常常在工程进度管理过程中努力追求一个费用最低工期并以其作为目标工期。在这里,目标工期的“工期短”、“费用低”两重属性成为工程项目管理的一个复合性控制标准。事实上,由于工程费用中的直接工程费随着工期缩短而增加,其间接费却随着工期缩短而减少,这样在工期取不恰当的情况下,直接工程费和间接费之和的工程费用将会较少:工程网络计划技术中将寻求这一恰当工期的过程称为工期费用优化,相应使工程费用达到最小取值的该恰当工期则被称为“费用最低工期”。 3、以资源工期标准确定目标工期
工程项目进度管理过程中,施工企业的进度计划将根据施工过程中实际可以调配的劳动力、施工机具设备、建筑材料、构配件、半成品、资金的具体状况决定。为此,企业时常面临的一个重要问题是在资源供给受限的情况下如何使工期达到最短。这一问题的实际解决过程便是施工企业确定目标工期的过程。因此“资源限定”和“工期最短”的两重属性同样构成了工程项目进度管理的一个复合性控制标准。施工企业将其作为工程项目进度管理中的目标工期能够最大限度地避免工程建造过程中由于一种或多种建设资源供给受限而导致的工程延誤,从而保证企业不致因此陷入被动。
针对建设项目的进度目标进行施工进度控制工程进度目标按期实现的前提是要有一个科学合理的进度计划。根据工程建设项目的规模、工程量与工程复杂程度,建设单位对工期和项目投产时间的要求,资金到位计划和实现的可能性,主要进场计划,进行科学分析后,制定出工程建设项目最佳的施工工期。工程施工进度控制就是根据进度目标确定实施方案,在施工过程中进行控制和调整,以实现进度控制的目标,具体的讲,进度控制的任务是进行进度规划、进度控制和进度协调。要完成好这个任务,应做好三项工作:第一、制定工程建设项目总进度目标和总计划;第二、要对进度进行控制,必须对建设项目进展的全过程,对计划进度与实际进度进行比较;第三、进度协调的任务是对整个建设项目中各安装、土建等施工单位、总包单位、分包单位之间的进度搭接,在时间、空间交叉上进行协调。施工进度计划是施工进度控制的依据。因此编制施工进度计划以提高进度控制的质量成为进度控制的关键问题。
四、工程进度的保证措施
1、施工组织保证
项目经理部管理人员及主要技术人员应由有类似施工经验的人员组成,为保证实现工期目标,应保证本工程所需的人力、物资、设备等,并迅速组织劳动力、设备、材料进场。在合同签署后,项目主要管理人员及时到位,并组织现场调查,编制实施性施工组织设计,同时加强与地方和当地群众的联系,争取当地居民的理解和支持,为工程施工创造良好外部环境,保证施工顺利进行。工程项目开工前,结合现场施工条件,安排临时设施并作好各项施工准备,编制本工程重难点工程施工方案,并及时报请监理工程师审核批准,尽量缩短施工准备时间,确保早进场、早开工。施工过程中搞好标准化施工,按质量管理体系,根据施工进度编制“月、旬、周”施工作业计划,合理安排工序,实现平行流水作业,加快施工进度。
2、物资保证
为了保证工程进度,每道工序所需的材料、构件、配件应事先做好准备,并做好各种物资的质量检验、试验、见证取样复试等工作。根据工程进度计划,施工单位应有相应的物资采购计划,材料的订货合同中,除质量要去外,应有供货时间、地点的条款,对某些材料、设备的供应,尚应考虑到对生产猖撅的考察和某些材料所需要的自然干燥时间,而提前做好订货。当然在材料、设备订货问题上,建设单位在资金上应给予保证,以取保工程能按计划进度展开,避免因材料供应问题而影响进度。
3、设备保证
施工机械对施工的效率有决定性作用,直接影响工程进度。
3.1在施工准备时就应按施工进度计划安排各种机械的使用时间,并做好主要机械设备的计划表。
3.2选择机械性能好、工作效率高的机械设备进场,特殊大型设备进场应考虑运输路线,如需道路管理协调的,更应提前准备。
3.3投入现场各种施工设备都应有上级主管部门的安检证明,操作人员必须持证上岗,并进行必要的技能培训和安全教育。实行岗位责任制,严格按操作规程作业,以保证机械的正常使用与安全。
3.4施工现场设立专业机械维修组,搞好机械设备的保养与维修,保证机械设备的完好率达到100%,随时具备施工状态。
3.5按主要机械计划,机械设备提前进场做为施工准备工作。
五、结束语
建筑工程施工进度控制的目标是为了实现项目建设工期,必须通过行之有效的控制与管理,充分把握研究影响进度的各种因素,针对施工进度控制存在的问题采取相应措施,主动积极的对施工进度进行控制,在工程项目实施过程中,进度控制就是经过不断地计划、执行、检查、分析和调整的动态循环,因此做好施工进度的计划与衔接,跟踪检查施工进度计划的执行情况,在必要时进行调整,在保证工程质量的前提下,确保工程建设进度目标的实现。
参考文献:
[1]郭军义.浅议工程项目进度控制.科技创新导报,2008,27:95.
[2] 蔡荣洲.对建筑工程施工进度管理的几点思考[J].华章,2011(22)
[3]欧春花.浅谈工程施工进度管理.山西建筑,2008,34(8).