摘要:水利水电工程建设周期长、投资大、协作部门多,受自然资源、地形、地质、水文气象条件的影响很大,也受当地经济发展水平、交通及其他资源市场条件的影响。本文分析了我国水利水电工程造价管理现状,并提出了工程造价的管理措施以及我国水利水电工程造价亟待解决的问题。
关键词:水利水电;工程造价;现状;问题
Abstract: water resources and hydropower engineering construction cycle is long, big investment and cooperation department, by natural resources, terrain, geology, hydrological and meteorological conditions of the great influence, but by the local economic development level, transportation and other resources market condition the influence. This paper analyzes the water conservancy and hydropower engineering cost management present situation, and proposed the project cost management measures in water conservancy and hydropower project cost problems to be solved.
Keywords: water conservancy and hydropower; Project cost; The present situation; question
中图分类号:TU723.3 文献标识码:A文章编号:
水利是国民经济和社会发展的基础产业。随着社会主义市场经济体制的建立和逐步完善,我国的水利水电造价也逐步由与计划经济的概预算定额向与市场经济相适应的工程造价转换,初步建立起了以工程定额作为指导的通过市场竞争形成的工程造价的机制。但是水利水电工程建设周期长、投资大、协作部门多,受自然资源、地形、地质、水文气象条件的影响很大,也受当地经济发展水平、交通及其他资源市场条件的影响。在计价方面,具有单件性、多次性、方法的多样性及依据的复杂性等特征。目前,由于全过程、全方位投资管理的理念尚未形成,投资管理的各个层面不够完善,导致工程投资中损失浪费的现象比较普遍。
一 水利水电工程造价管理现状分析
(一)没有形成完善的、系统的全过程造价管理体系
“二分式”管理模式受长期计划经济时期管理模式的影响,我国在造价管理过程中还没有形成完善的、系统的全过程造价管理体系。工程造价管理涉及的过程复杂,涉及建设、设计,施工、咨询、政府部门等多方建设主体,这决定了管理工作的复杂性,同时给全过程管理带来很大的难度。实际工作中,建设工程造价管理一般通过几个单位来完成,实行“分单位、分阶段”的“二分式”管理方式。即项目决策与设计阶段的造价控制由设计单位的造价专业人员完成,承发包阶段的造价控制由具有自行招标能力的项目业主或具有招标代理资质的造价咨询单位完成。施工阶段的造价控制则由监理单位的造价专业人员完成,竣工与后评价阶段的造价控制由具有审价资格的造价咨询单位完成。
此模式产生的弊端是:①不利于投资的有效控制。造价控制是—个动态的过程,每个环节之间有一定的联系,前面的环节是否做好,需要下一个环节来验证,客观上要求每一个环节之间应该紧密联系,统一管理;②不利于造价咨询单位的发展。“二分式”管理必然造成造价诲询单位经营业务狭窄,业务量偏小,总体规模偏小;③不利于培养高层次造价专业人员。按照国际惯例,从事工程造价咨询的专业人员应该是以工程技术为基础,兼有经济、法律、管理等方面知识的复合型人才。由于“二分式”管理,造价从业人员接触面窄,不利于培养高层次复合型人才。
(二)采用“单位估价法”编制水利水电工程造价
目前通行的预测建设工程造价的基本方法大致有两种,即“单位估价法”和“实物量法”。我国采用单位估价法,单位估价法所采用的定额是在一定时期、一定范围由行政部门编制颁发的,反映了这一时期、这个行业或地域的“共性”,与某个具体工程项目“个性”之间必然存在差异。且这种差异有时会很大。特别是水利水电、交通工程与自然条件密切相关,具有突出的“个性”,往往与全国(或全省)通用定额“共性”的矛盾比较突出,再采用国家或地方政府统一颁发的费率计算,很难体现企业的真实水平和竞争优势,随着我国市场经济的日益完善,这种缺陷就越来越突出。
二 加强水利工程造价管理措施
(一)实施全过程的工程造价管理
美国造价工程师协会在20世纪提出全过程造价管理,有效地利用专业的、技术的专长与方法去计划和控制资源、造价、利润和风险,并使之贯穿于整个项目的始终。国外工程造价咨询机构一般为委托方提供以工程造价为龙头的全方位、全过程的工程咨询服务,实行全过程造价管理的服务手段也更先进,一般均有强大的工程造价与工程管理系统软件支持,能为委托方提供详尽的工程进展以及支付资料,并能提出分析意见和控制措施,从而协助业主在项目实施过程中对投资进行监控并最终实现投资目标。
(二)建设工程招投标阶段造价的控制
招投标实质上是一种市场竞争行为,形成由市场定价的价格机制,能不断降低社会平均劳动消耗水平,使工程价格得到有效控制,实现生产力资源优化配置。便于供求双方更好地相互选择,使工程价格更加符合价值基础。同时在勘查、设计、施工、监理及与工程建设有关的重要设备材料的采购方而推行招投标制,建立健全招投标法律结构体系,改进招投标工作,强化监督与服务。
(三)施工阶段工程造价控制
施工方案的选择。施工组织设计应体现降低工程成本的措施,选用经济合理的施工方案。如在基础施工阶段,土方机械的合理选用和配合、基坑围护方案、井点设置等都对工程成本产生较大的影响。健全工程质量保证体系,严格按照施工工艺施工,防止返工造成浪费和损失。每个工程项目都要建立以项目经理为组长的质量保证体系,各工序要设有专职或兼职的质检员,对工程施工全过程的质量进行有效的监督和控制,质量管理有章可循,落實到人。材料、设备的采购和管理中要加强材料在预算-计划-采购-签收-领用-使用-监督-回收等各个环节的责任制,落实到人,要严格按照施工材料消耗定额和工程进度安排用料,限额领用,并对材料使用量上进行监督,防止浪费,合理使用资源。合格施工人员的配备。一般说来,人工费主要根据工程项目所需用工量以及人工单价而确定。由于目前农村剩余劳动力的不断增加,城市建筑劳动力的主要来源是外来民工,在施工现场中以班组承包的方式较多。由于劳动力来源不同,技术水平也存在较大差异,有必要对各个班组进行筛选,选用技术熟练的班组承包各工种的施工作业,这样能从现场施工作业这第一道环节控制施工质量、减少浪费、缩短工期,降低成本和造价。施工阶段的造价控制需要各方共同努力,才能实现即定的各项目标,取得社会效益和经济效益。
(四)采用“实物量法”编制水利水电工程造价
国际上通用的计价办法是采用“实物量法”,它克服了我国水利水电工程编制及预算所惯用的“定额法”计价的弊端,能够按照各项目的具体特点,与设计、施工紧密结合,真实地反映工程的实际成本,其最大特点是联系单个工程实际情况,依据设计方案、施工布置与进度、施工方法与技术、总工程量和劳动生产率、施工组织管理、法律法规政策等来测算实际所需的直接和间接成本以及相应的费用,工程的个性能充分显示出来,有利于有效管理和控制工程造价。
三 我国水利水电工程造价亟待解决的问题
目前,我国真正能做到建设工程全过程造价管理的咨询机构数量极少,多数咨询机构规模偏小,基础较差,在社会上的根基还不稳同。满足全过程造价管理的业务人员素质还有待提高,编制工程造价的方法还需要改革和完善。
从造价确定的方法来看,传统造价管理是基于标准定额,而全过程造价管理,是基于项目活动。这种方法的基础理论是任何项目成本的形成,都是由于消耗或占用一定的资源所造成。而任何这种资源的消耗和占用,都是由于开展项目活动所造成。所以,要准确地确定项目造价,首先应该确定项目的活动,然后确定项目活动所消耗的资源,再确定项目活动的造价。从造价控制的方法来看,传统的造价管理,主要是通过对工程结算价的控制来实现。而全过程造价管理,则是通过项目活动和过程的优化来实现。这种方法的基础理论是任何项目成本的节约,都是由于项目资源的消耗及占用的减少而形成。项目资源消耗及占用的减少,是通过消除或减少无效、低效的项目活动来实现。
四 结束语
工程造价管理是一项技术性、专业性很强的工作,它贯穿于投资决策、项目设计、招标投标、建设施工和竣工结算各阶段。为了有效地控制工程造价,需要各部门的综合协调,共同努力,才能最大限度地控制工程造价,实现较为理想的投资效益。
参考文献:
[1]蔡付林.水利工程投资管理中存在的问题及解决方法[J].人民长江,2009(20).
[2]蒋瑞.工程造价对工程质量影响的分析[J].城市建设,2009(2).
[3]詹志琴.关于新疆水利工程造价问题的浅谈[J].科技创新导报,2011(1).
[4]潘新国.工程造价对施工企业影响的探讨[J].水利技术,2007(3).
关键词:水利水电;工程造价;现状;问题
Abstract: water resources and hydropower engineering construction cycle is long, big investment and cooperation department, by natural resources, terrain, geology, hydrological and meteorological conditions of the great influence, but by the local economic development level, transportation and other resources market condition the influence. This paper analyzes the water conservancy and hydropower engineering cost management present situation, and proposed the project cost management measures in water conservancy and hydropower project cost problems to be solved.
Keywords: water conservancy and hydropower; Project cost; The present situation; question
中图分类号:TU723.3 文献标识码:A文章编号:
水利是国民经济和社会发展的基础产业。随着社会主义市场经济体制的建立和逐步完善,我国的水利水电造价也逐步由与计划经济的概预算定额向与市场经济相适应的工程造价转换,初步建立起了以工程定额作为指导的通过市场竞争形成的工程造价的机制。但是水利水电工程建设周期长、投资大、协作部门多,受自然资源、地形、地质、水文气象条件的影响很大,也受当地经济发展水平、交通及其他资源市场条件的影响。在计价方面,具有单件性、多次性、方法的多样性及依据的复杂性等特征。目前,由于全过程、全方位投资管理的理念尚未形成,投资管理的各个层面不够完善,导致工程投资中损失浪费的现象比较普遍。
一 水利水电工程造价管理现状分析
(一)没有形成完善的、系统的全过程造价管理体系
“二分式”管理模式受长期计划经济时期管理模式的影响,我国在造价管理过程中还没有形成完善的、系统的全过程造价管理体系。工程造价管理涉及的过程复杂,涉及建设、设计,施工、咨询、政府部门等多方建设主体,这决定了管理工作的复杂性,同时给全过程管理带来很大的难度。实际工作中,建设工程造价管理一般通过几个单位来完成,实行“分单位、分阶段”的“二分式”管理方式。即项目决策与设计阶段的造价控制由设计单位的造价专业人员完成,承发包阶段的造价控制由具有自行招标能力的项目业主或具有招标代理资质的造价咨询单位完成。施工阶段的造价控制则由监理单位的造价专业人员完成,竣工与后评价阶段的造价控制由具有审价资格的造价咨询单位完成。
此模式产生的弊端是:①不利于投资的有效控制。造价控制是—个动态的过程,每个环节之间有一定的联系,前面的环节是否做好,需要下一个环节来验证,客观上要求每一个环节之间应该紧密联系,统一管理;②不利于造价咨询单位的发展。“二分式”管理必然造成造价诲询单位经营业务狭窄,业务量偏小,总体规模偏小;③不利于培养高层次造价专业人员。按照国际惯例,从事工程造价咨询的专业人员应该是以工程技术为基础,兼有经济、法律、管理等方面知识的复合型人才。由于“二分式”管理,造价从业人员接触面窄,不利于培养高层次复合型人才。
(二)采用“单位估价法”编制水利水电工程造价
目前通行的预测建设工程造价的基本方法大致有两种,即“单位估价法”和“实物量法”。我国采用单位估价法,单位估价法所采用的定额是在一定时期、一定范围由行政部门编制颁发的,反映了这一时期、这个行业或地域的“共性”,与某个具体工程项目“个性”之间必然存在差异。且这种差异有时会很大。特别是水利水电、交通工程与自然条件密切相关,具有突出的“个性”,往往与全国(或全省)通用定额“共性”的矛盾比较突出,再采用国家或地方政府统一颁发的费率计算,很难体现企业的真实水平和竞争优势,随着我国市场经济的日益完善,这种缺陷就越来越突出。
二 加强水利工程造价管理措施
(一)实施全过程的工程造价管理
美国造价工程师协会在20世纪提出全过程造价管理,有效地利用专业的、技术的专长与方法去计划和控制资源、造价、利润和风险,并使之贯穿于整个项目的始终。国外工程造价咨询机构一般为委托方提供以工程造价为龙头的全方位、全过程的工程咨询服务,实行全过程造价管理的服务手段也更先进,一般均有强大的工程造价与工程管理系统软件支持,能为委托方提供详尽的工程进展以及支付资料,并能提出分析意见和控制措施,从而协助业主在项目实施过程中对投资进行监控并最终实现投资目标。
(二)建设工程招投标阶段造价的控制
招投标实质上是一种市场竞争行为,形成由市场定价的价格机制,能不断降低社会平均劳动消耗水平,使工程价格得到有效控制,实现生产力资源优化配置。便于供求双方更好地相互选择,使工程价格更加符合价值基础。同时在勘查、设计、施工、监理及与工程建设有关的重要设备材料的采购方而推行招投标制,建立健全招投标法律结构体系,改进招投标工作,强化监督与服务。
(三)施工阶段工程造价控制
施工方案的选择。施工组织设计应体现降低工程成本的措施,选用经济合理的施工方案。如在基础施工阶段,土方机械的合理选用和配合、基坑围护方案、井点设置等都对工程成本产生较大的影响。健全工程质量保证体系,严格按照施工工艺施工,防止返工造成浪费和损失。每个工程项目都要建立以项目经理为组长的质量保证体系,各工序要设有专职或兼职的质检员,对工程施工全过程的质量进行有效的监督和控制,质量管理有章可循,落實到人。材料、设备的采购和管理中要加强材料在预算-计划-采购-签收-领用-使用-监督-回收等各个环节的责任制,落实到人,要严格按照施工材料消耗定额和工程进度安排用料,限额领用,并对材料使用量上进行监督,防止浪费,合理使用资源。合格施工人员的配备。一般说来,人工费主要根据工程项目所需用工量以及人工单价而确定。由于目前农村剩余劳动力的不断增加,城市建筑劳动力的主要来源是外来民工,在施工现场中以班组承包的方式较多。由于劳动力来源不同,技术水平也存在较大差异,有必要对各个班组进行筛选,选用技术熟练的班组承包各工种的施工作业,这样能从现场施工作业这第一道环节控制施工质量、减少浪费、缩短工期,降低成本和造价。施工阶段的造价控制需要各方共同努力,才能实现即定的各项目标,取得社会效益和经济效益。
(四)采用“实物量法”编制水利水电工程造价
国际上通用的计价办法是采用“实物量法”,它克服了我国水利水电工程编制及预算所惯用的“定额法”计价的弊端,能够按照各项目的具体特点,与设计、施工紧密结合,真实地反映工程的实际成本,其最大特点是联系单个工程实际情况,依据设计方案、施工布置与进度、施工方法与技术、总工程量和劳动生产率、施工组织管理、法律法规政策等来测算实际所需的直接和间接成本以及相应的费用,工程的个性能充分显示出来,有利于有效管理和控制工程造价。
三 我国水利水电工程造价亟待解决的问题
目前,我国真正能做到建设工程全过程造价管理的咨询机构数量极少,多数咨询机构规模偏小,基础较差,在社会上的根基还不稳同。满足全过程造价管理的业务人员素质还有待提高,编制工程造价的方法还需要改革和完善。
从造价确定的方法来看,传统造价管理是基于标准定额,而全过程造价管理,是基于项目活动。这种方法的基础理论是任何项目成本的形成,都是由于消耗或占用一定的资源所造成。而任何这种资源的消耗和占用,都是由于开展项目活动所造成。所以,要准确地确定项目造价,首先应该确定项目的活动,然后确定项目活动所消耗的资源,再确定项目活动的造价。从造价控制的方法来看,传统的造价管理,主要是通过对工程结算价的控制来实现。而全过程造价管理,则是通过项目活动和过程的优化来实现。这种方法的基础理论是任何项目成本的节约,都是由于项目资源的消耗及占用的减少而形成。项目资源消耗及占用的减少,是通过消除或减少无效、低效的项目活动来实现。
四 结束语
工程造价管理是一项技术性、专业性很强的工作,它贯穿于投资决策、项目设计、招标投标、建设施工和竣工结算各阶段。为了有效地控制工程造价,需要各部门的综合协调,共同努力,才能最大限度地控制工程造价,实现较为理想的投资效益。