摘要:实行工程量清单计价法是深化工程造价管理改革的重要举措之一。工程量清单计价法不同于以往的定额计价法,工程量清单计价是适应社会主义市场经济需要的产物。本文主要从几个方面分析工程量清单计价的特点,谈谈工程量清单计价对工程造价控制的影响,分析工程量清单计价的意义和目的。
关键词:工程清单计价;特点;造价控制;意义;目的
Abstract: The implementation of engineering quantity list valuation method is one of the important measures for deepening the reform of the management of project cost. Engineering quantity list valuation method is different from the traditional quota valuation method, bill of quantities is the product to meet the needs of the socialist market economy. This paper analyses the characteristics of engineering quantity list pricing mainly from several aspects, talk about the engineering quantity list valuation of project cost control, analysis the meaning and purpose of the bill of quantities.
Key words: engineering bill pricing; characteristics; cost control; significance; objective
中图分类号:TU723.3文献标识码:A 文章编号:2095-2104(2012)
随着我国社会主义市场经济的发展,特别是我国已经加入WTO,建设工程造价行业与国际接轨已是势在必行,而工程量清单计价方式在国际上通行已有上百年历史,规章完备,体系成熟。我省也即将推出工程量计价方式,这将给我省工程造价领域带来一场深刻革命,进一步推进工程计价依据的改革,与国际惯例靠拢,通过市场形成价格,以迎接我国加入WTO的挑战。
一、现行工程计价方式存在的问题
在我国社会主义市场经济体制中,将建筑产品列为商品经济的范畴,既然属于商品,那么其具体价格应该根据商品的社会价值由市场决定。
l、在组成工程总造价的定额单价虽然能够反映社会平均先进水平,但它是静态的单价,很难反映具体工程中千差万别的动态变化,无法在施工企业中实行有效竞争。
2、现行的费用定额计划经济的色彩非常浓厚,施工企业的管理费与利润等费率是固定不变的。每一个单位工程,施工单位报价都是采用相同的间接费率,这违背了市场的规律,不利于企业在提高自身管理水平上下功夫,也使施工企业难以发挥各自的优势,无法展开良性的竞争。
3、現行的造价管理及招投标管理模式跟不上市场经济发展的要求,目前工程招投标都以主管部门的指令为依据,发包方与投标方共用一本定额制定报价,施工企业不能根据自身的劳动生产率以及经济灵活的施工方案合理制定报价,因此往往使预算人员的业务水平成为是否能中标的关键因素,也导致施工企业之间互相盲目压价,从而产生恶性竞争。
4、建筑市场的不断更新发展,使得更多新技术、新工艺、新机具、新材料不断出现,相应的工、料、机水平也处于相对的变化中,现行的预算定额水平和更新速度肯定赶不上建筑市场的发展因此全面以预算定额来确定工程造价很难解决一些现实的复杂的问题。
二、工程量清单计价的特点
工程量清单计价模式是对原有定额计价模式的改革,与原有定额计价模式相比,具有完全不同的特点:
1.工程量清单计价采用综合单价计价,综合单价中综合了工程直接费、间接费、利润和税金等其他费用,有些还综合了技术措施费及施工单位降低的成本费(与现行国家颁布的定额及费用水平相比)。这种计价方式有利于施工企业编制自己的定额,加强企业内部管理,积极大胆创新、推行新工艺、新方法的使用,通过提高技术水平和企业内部定额水平,极大地提高其在招投标中的竞争力,从而推动整个建筑行业健康迅猛地发展。
2.工程量清单计价要求投标单位根据市场行情和自身实力对工程量清单项目逐项报价,其一:避免了工程招标中的弄虚作假、暗箱操作等违规行为,如:有些招标规定,投标总价必须等十各分项报价之和,避免有些临开标时随意调整投标总价,另外投标时的单价在竣工结算时,是不能改变的,如果谁改变了,该次招投标就会受到质疑。其二:有利于招投标工作的顺利进行,如采用定额加费用招标,定额缺项项目、特殊工艺项目的计价无据可依,使标底计价与各施工单位投标报价很难统一,使招投标工作难度增大,而工程量清单计价,由投标单位根据自身情况自行编制综合单价,优价中标,从而克服了原有定额计价招标的不足。
3.工程量清单计价具有合同化的法定性,投标时的分项工程单价在工程设计变更计价、进度报表计价、竣工结算计价时是不能改变的,从而大大简化了工程项目各个阶段的预结算编审工作。
三、工程量清单的编制思路
1、工程造价管理部门可采用国际惯例作为整体框架,对工程量计算规则加以研究完善,制定全国统一的工程量计算规则,在以下几个方面与国际通行办法相统一,即:统一划分项目,统一计量单位,统一工程量计算,统一计价表的形式,同时编制出相应的工料消耗定额。
2、工程量清单应由具备招标文件的招标人或招标人委托的具有相应资质的造价咨询单位缠制,这是招标人编制标底的依据,是投标方报价的依据,也是竣工结算调整的依据,它应包括编制说明和清单两部分,编制说明应包括编制依据、分部分项工程工作内容的补充要求,施工工艺等特殊要求、以及主要材料价格档次的设定。
3、工程量清单的编制应按有关图纸、工程地质报告、施工规范、设计图集等要求和规定进行编制。要求表述清楚、用语规范。编制的内容中除實物消耗形态的项目之外,招标方还应列出非实物形态的竞争费用。同时也要明确竞争与非竞争工程费用的分类。
四、工程量清单计价模式下的造价控制
1.工程项目准备阶段。在这一阶段造价控制的重点是:充分了解分项工程内容、了解工程价格的市场行情和各种应缴税费的情况。作为业主可以聘请有经验的专业人员,也可以委托具有相关资质的工程中介机构调查,提供有关分项工程单价报告,为工程招投标作好充分准备。
2、工程项目施工招投标阶段,将产生一系列重要的招投标文件,这些文件资料将直接影响工程造价的确定与控制,招标方应严密注意招标文件的编制,表达清楚,准确体现业主的意愿,做到与工程量清单相互对应与衔接,口径应一致,否则如果出现漏洞,即会成为施工单位追加工程款的突破口,从而造成纠纷,引起索赔。
3.工程项目施工实施阶段。在这一阶段,主要的工作是落实第二阶段已确定的造价控制目标与控制计划,严格执行工程量清单计价的原则与内容,特别是注意增减工程量的签证工作。在工程量签证前,应区分哪些该签,哪些不该签;哪些项目是合同内,哪些项目是合同外;哪些工作内容已在投标单价中包含,哪些没有包含;如果要签应该签多少等等。
4.工程项目竣工结算阶段。在这一阶段造价控制的重点是:核算实际完成工程量,核实各分项工程使用的综合单价是否与投标时或合同签订时的综合单价一一对应,审核竣工结算汇总金额。如果工程量清单计价中的工程数量不包死,就应按竣工图纸、设计变更等竣工资料重新准确计算工程量。如果设计变更增加的分项工程在招标时的工程量清单中无相应项目单价,须重点核实增加的项目的综合单价是否按招标文件及施工合同进行编制,编制是否合理等。在这一阶段里,可能会遇到施工单位追加工程造价的索赔,这在工程量清单计价模式里,是很正常的现象。作为造价控制,可以实施反索赔,这也是我们工程造价控制工作需要努力加强的。
五、结束语
随着工程量清单计价的不断推行,传统定额计价的模式将逐渐弱化,但同样也对我们造价管理工作者提出了更高的要求,学习、推广工程量清单计价解决工程量清单计价实施中的问题,完善提高工程量清单计价管理办法,是我们义不容辞的责任和义务。作为造价管理工作者,为適应市场需求,必须不断学习新的工程技术知识,学习国外造价管理中的先进经验和技术、理论和实践相结合,把自己锻炼成适应时代需求的造价工作者。
参考文献
[1]《建设工程工程量清单计价规范》(GB50500-2008);
[2]《建筑工程设计概算编制办法 》;
[3]《招标代理服务收费管理暂行办法》 (计价格[2002]1980号) ;
[4]《建设单位管理费》财建【2002】394号文;
关键词:工程清单计价;特点;造价控制;意义;目的
Abstract: The implementation of engineering quantity list valuation method is one of the important measures for deepening the reform of the management of project cost. Engineering quantity list valuation method is different from the traditional quota valuation method, bill of quantities is the product to meet the needs of the socialist market economy. This paper analyses the characteristics of engineering quantity list pricing mainly from several aspects, talk about the engineering quantity list valuation of project cost control, analysis the meaning and purpose of the bill of quantities.
Key words: engineering bill pricing; characteristics; cost control; significance; objective
中图分类号:TU723.3文献标识码:A 文章编号:2095-2104(2012)
随着我国社会主义市场经济的发展,特别是我国已经加入WTO,建设工程造价行业与国际接轨已是势在必行,而工程量清单计价方式在国际上通行已有上百年历史,规章完备,体系成熟。我省也即将推出工程量计价方式,这将给我省工程造价领域带来一场深刻革命,进一步推进工程计价依据的改革,与国际惯例靠拢,通过市场形成价格,以迎接我国加入WTO的挑战。
一、现行工程计价方式存在的问题
在我国社会主义市场经济体制中,将建筑产品列为商品经济的范畴,既然属于商品,那么其具体价格应该根据商品的社会价值由市场决定。
l、在组成工程总造价的定额单价虽然能够反映社会平均先进水平,但它是静态的单价,很难反映具体工程中千差万别的动态变化,无法在施工企业中实行有效竞争。
2、现行的费用定额计划经济的色彩非常浓厚,施工企业的管理费与利润等费率是固定不变的。每一个单位工程,施工单位报价都是采用相同的间接费率,这违背了市场的规律,不利于企业在提高自身管理水平上下功夫,也使施工企业难以发挥各自的优势,无法展开良性的竞争。
3、現行的造价管理及招投标管理模式跟不上市场经济发展的要求,目前工程招投标都以主管部门的指令为依据,发包方与投标方共用一本定额制定报价,施工企业不能根据自身的劳动生产率以及经济灵活的施工方案合理制定报价,因此往往使预算人员的业务水平成为是否能中标的关键因素,也导致施工企业之间互相盲目压价,从而产生恶性竞争。
4、建筑市场的不断更新发展,使得更多新技术、新工艺、新机具、新材料不断出现,相应的工、料、机水平也处于相对的变化中,现行的预算定额水平和更新速度肯定赶不上建筑市场的发展因此全面以预算定额来确定工程造价很难解决一些现实的复杂的问题。
二、工程量清单计价的特点
工程量清单计价模式是对原有定额计价模式的改革,与原有定额计价模式相比,具有完全不同的特点:
1.工程量清单计价采用综合单价计价,综合单价中综合了工程直接费、间接费、利润和税金等其他费用,有些还综合了技术措施费及施工单位降低的成本费(与现行国家颁布的定额及费用水平相比)。这种计价方式有利于施工企业编制自己的定额,加强企业内部管理,积极大胆创新、推行新工艺、新方法的使用,通过提高技术水平和企业内部定额水平,极大地提高其在招投标中的竞争力,从而推动整个建筑行业健康迅猛地发展。
2.工程量清单计价要求投标单位根据市场行情和自身实力对工程量清单项目逐项报价,其一:避免了工程招标中的弄虚作假、暗箱操作等违规行为,如:有些招标规定,投标总价必须等十各分项报价之和,避免有些临开标时随意调整投标总价,另外投标时的单价在竣工结算时,是不能改变的,如果谁改变了,该次招投标就会受到质疑。其二:有利于招投标工作的顺利进行,如采用定额加费用招标,定额缺项项目、特殊工艺项目的计价无据可依,使标底计价与各施工单位投标报价很难统一,使招投标工作难度增大,而工程量清单计价,由投标单位根据自身情况自行编制综合单价,优价中标,从而克服了原有定额计价招标的不足。
3.工程量清单计价具有合同化的法定性,投标时的分项工程单价在工程设计变更计价、进度报表计价、竣工结算计价时是不能改变的,从而大大简化了工程项目各个阶段的预结算编审工作。
三、工程量清单的编制思路
1、工程造价管理部门可采用国际惯例作为整体框架,对工程量计算规则加以研究完善,制定全国统一的工程量计算规则,在以下几个方面与国际通行办法相统一,即:统一划分项目,统一计量单位,统一工程量计算,统一计价表的形式,同时编制出相应的工料消耗定额。
2、工程量清单应由具备招标文件的招标人或招标人委托的具有相应资质的造价咨询单位缠制,这是招标人编制标底的依据,是投标方报价的依据,也是竣工结算调整的依据,它应包括编制说明和清单两部分,编制说明应包括编制依据、分部分项工程工作内容的补充要求,施工工艺等特殊要求、以及主要材料价格档次的设定。
3、工程量清单的编制应按有关图纸、工程地质报告、施工规范、设计图集等要求和规定进行编制。要求表述清楚、用语规范。编制的内容中除實物消耗形态的项目之外,招标方还应列出非实物形态的竞争费用。同时也要明确竞争与非竞争工程费用的分类。
四、工程量清单计价模式下的造价控制
1.工程项目准备阶段。在这一阶段造价控制的重点是:充分了解分项工程内容、了解工程价格的市场行情和各种应缴税费的情况。作为业主可以聘请有经验的专业人员,也可以委托具有相关资质的工程中介机构调查,提供有关分项工程单价报告,为工程招投标作好充分准备。
2、工程项目施工招投标阶段,将产生一系列重要的招投标文件,这些文件资料将直接影响工程造价的确定与控制,招标方应严密注意招标文件的编制,表达清楚,准确体现业主的意愿,做到与工程量清单相互对应与衔接,口径应一致,否则如果出现漏洞,即会成为施工单位追加工程款的突破口,从而造成纠纷,引起索赔。
3.工程项目施工实施阶段。在这一阶段,主要的工作是落实第二阶段已确定的造价控制目标与控制计划,严格执行工程量清单计价的原则与内容,特别是注意增减工程量的签证工作。在工程量签证前,应区分哪些该签,哪些不该签;哪些项目是合同内,哪些项目是合同外;哪些工作内容已在投标单价中包含,哪些没有包含;如果要签应该签多少等等。
4.工程项目竣工结算阶段。在这一阶段造价控制的重点是:核算实际完成工程量,核实各分项工程使用的综合单价是否与投标时或合同签订时的综合单价一一对应,审核竣工结算汇总金额。如果工程量清单计价中的工程数量不包死,就应按竣工图纸、设计变更等竣工资料重新准确计算工程量。如果设计变更增加的分项工程在招标时的工程量清单中无相应项目单价,须重点核实增加的项目的综合单价是否按招标文件及施工合同进行编制,编制是否合理等。在这一阶段里,可能会遇到施工单位追加工程造价的索赔,这在工程量清单计价模式里,是很正常的现象。作为造价控制,可以实施反索赔,这也是我们工程造价控制工作需要努力加强的。
五、结束语
随着工程量清单计价的不断推行,传统定额计价的模式将逐渐弱化,但同样也对我们造价管理工作者提出了更高的要求,学习、推广工程量清单计价解决工程量清单计价实施中的问题,完善提高工程量清单计价管理办法,是我们义不容辞的责任和义务。作为造价管理工作者,为適应市场需求,必须不断学习新的工程技术知识,学习国外造价管理中的先进经验和技术、理论和实践相结合,把自己锻炼成适应时代需求的造价工作者。