介绍了热烟气烘炉法在山东里彦电厂二期续建工程2×135MW机组循环流化床锅炉烘炉过程中的应用,同时对循环流化床锅炉烘炉方案进行了探讨与优化,为同类型循环流化床锅炉的烘炉提供参考。
This paper introduces the application of hot flue gas oven method in circulating circulating fluidized bed boiler of 2 × 135MW unit in the second phase of Shandong Lianyan Power Plant. At the same time, the scheme of circulating fluidized bed boiler is discussed and optimized. For the same type of circulating fluidized bed boiler for reference.