随着企业的发展,华电国际电力股份有限公司邹县发电厂(以下简称邹县电厂)8台机组拥有2个技术等级、3个容量等级、454万千瓦的装机容量,特别是对新老机组进行脱硫、除尘、设备变频等大量技术改造后,加大了规范化运行管理的难度,其中33.5万千瓦、60万千瓦机组投运时间较早,其经济技术指标与同类型的先进机组相比已无优势可言:2台100万千瓦机组投运时间短,运行经验不成熟,仍处于需要“呵护”的成长期。在这种情况下,不仅要保证机组安全生产,又要
With the development of enterprises, eight units of Huadian Power International Co., Ltd. Zouxian Power Plant (hereinafter referred to as Zouxian Power Plant) have two technical levels, three capacity levels, 4.54 million kilowatts of installed capacity, especially for new and old units Carrying out a large number of technological transformations such as desulfurization, dust removal and frequency conversion of equipment has increased the difficulty of standardized operation and management. Among them, 335,000 kilowatts and 600,000 kilowatts units have been put into operation earlier and their economic and technical indexes have been compared with the advanced units of the same type No advantage At a minimum: 2 sets of 1 million kilowatts units commissioned a short time, the operation experience is immature, still in need of “care” of the growth period. In this case, not only to ensure the safety of production units, but also