某仓库为五层无梁楼盖结构,柱网间距为6m,仓库长84m,宽36m,单层建筑面积为3200m~2,要求地坪混凝土强度等级为 C20。一、方案确定浇筑如此大面积地坪混凝土,如采用传统的一次浇筑成型方法,就会造成短期内工作量过于集中,工程质量难以达到预期的目标。于是我们提出了—个化整为零、分块拼装的施工方案,就是以柱网为基本单位,用3×3小角钢进行分隔、分块浇筑混凝土的方法。
A warehouse is a five-story non-beam floor structure, column spacing of 6m, warehouse length 84m, width 36m, single-floor building area of 3200m ~ 2, required concrete floor strength level C20. First, the program to determine the placement of such a large area of floor concrete, such as the use of a traditional pouring molding method, will result in short-term workload is too concentrated, the project quality is difficult to achieve the desired goal. So we put forward - a whole is zero, the construction of sub-assembly of the program is to column net as the basic unit, with 3 × 3 small angle separation, sub-block pouring concrete.