更换提升钢绳的方法和工艺有很多种,现介绍一种根据我 矿的实际情况而设计的更换多绳提升机钢绳的工艺。 1 设施简介 我矿的矿用电梯采用的是多绳摩擦提升工艺设计,曳引机直径仅1m,主要的作用是联通五、六中段,作为人员、材料和设备运输的通道。六中段与五中段水平层高相差50m,中间每间隔10ml个分层。机房设计在高于五中段11.5m上的1个分层内。原设计的操作硐室处于井底水窝同一水平,铺设电缆和控制线路进入机房的距离较远,而且在检修时不易联系。我将操作硐室设计于机房的下一个分层内,即检修硐室与五中段处于同一水平,铺设电缆和控制线路均较近,而且检修时易于联系。提升钢绳选用6x19φ15.5左同向捻钢绳2根和6x19φ15.5
There are many ways to replace the hoisting ropes. Now I will introduce a process of changing the ropes of a multi-hoist hoist according to the actual conditions of mine. 1 Brief Introduction of Facilities I mine mine elevator is multi-rope friction lifting process design, traction machine diameter of only 1m, the main role is China Unicom five or six intermediate section, as the personnel, materials and equipment transport channel. The difference between the middle level of the sixth and the middle level of the fifth level is 50m, with 10ml intervals in the middle. The engine room is designed to be within 1 strata above 11.5 m in the middle section. The original design of the operation chamber at the bottom of the water hole at the same level, laying cables and control lines into the room a long distance, and not easy to contact in the repair. I will operate the chamber design in the next level of the engine room, that is, the maintenance chamber is in the same level as the middle section of the fifth floor, laying cables and control lines are close, and easy to contact when overhauling. Hoisting steel rope selection 6x19φ15.5 left twist rope with 2 and 6x19φ15.5