基于Revit系列软件,以广州某地铁车辆段上盖装配式项目为例,分析装配式项目在准备、建模、出图、深化四个阶段的协同设计流程,并探讨这四个阶段的具体工作,包括制度和操作两个层面的协同设计准备工作;方案设计、初步设计、施工图设计三阶段的建模过程并借助YJK-AMCS模块快速创建装配式模型;通过共享参数、注释族的运用,达到Revit出平法施工图的目的等。
Based on the Revit series of softwares, taking the assembly project of a metro depot in Guangzhou as an example, this paper analyzes the collaborative design process of the assembly project in the four stages of preparation, modeling, drawing and deepening, and discusses the concrete work in these four stages , Including three aspects of the system and operation of the collaborative design preparation; program design, preliminary design, construction drawing design three stages of modeling process and quickly create assembly model with YJK-AMCS module; through the sharing of parameters, the use of annotation family, Revit to achieve the purpose of building plans and so on.