论文部分内容阅读
以大兴区生物医药产业基地为例,阐述用水平衡测试进行供水损失分析的内容、步骤和方法,并初步得出了基地供水损失原因突出表现在:水表安装不规范、口径选择过大、未按要求检定或更换及总分表计量精度悬殊等问题上,且基地各涉水部门存在着对供水管网、自备井供水企业疏于管理,普遍不重视与水相关的管理工作等管理问题,提出应从规范水表使用、加强水平衡测试、加强与水相关的管理工作、提高自身节水、用水及管水的管理水平等为重点开展整改。
Taking Daxing District Biomedical Industry Base as an example, the contents, steps and methods of water supply loss analysis by using water balance test are expounded. The reasons of water loss of base station are preliminarily manifested in: irregular installation of water meter, excessive selection of caliber, Requirements for verification or replacement and the total measurement accuracy of the disparity table and other issues, and the base of the water sector there is a water supply network, owned well water supply business neglect management, generally do not attach importance to water management and other management issues, It is suggested that rectification should be carried out with the focus on regulating the use of water meters, strengthening the water balance test, strengthening the management of water related issues, and improving the management level of water conservation, water use and water management.