论文部分内容阅读
针对某大型沉井出现的倾斜情况 ,经过多方案分析比较 ,择优应用“井外挖土”纠偏法 ,取得较好效果。
In response to the tilting situation of a large-scale open caisson, a multi-plan analysis was conducted to select the best application of the “excavation outside the well” correction method to achieve better results.