论文部分内容阅读
本文结合高速公路建设中出现的招标图与施工图出入较大而导致的原中标清单的调整,对该部分新增项目单价的审核能有效地控制工程造价,保证项目目标管理的实现。如何做好该部分的审核工作?现分以下三方面详述。
This paper, combined with the adjustment of the original bid list caused by the larger bidding drawings and construction drawings in the expressway construction, effectively controls the project cost and ensures the realization of the target management of the project. How to do a good job in this part of the audit? The following points are detailed below.