1986年4月10日至13日水电部科技司和机械修造公司在北京电力设备总厂主持召开了国产12.5万千瓦汽轮机高压缸通流部分改进成果鉴定会。鉴定委员会由24个单位的25名代表组成。与会代表听取了西安热工研究所、北京电力设备总厂和秦岭发电厂等工作单位对该课题的改进设计、制造和试验以及在试点机组秦岭电厂2号机上的实际应用等工作的汇报,并进行了认真地讨论,一致通过技术鉴定证书。鉴定会认为该型机组改进后的高压缸采用宽—窄
April 10, 1986, Ministry of Science and Technology and the Ministry of MOH machinery construction company in Beijing Power Equipment Plant presided over the domestically produced 125,000 kilowatts turbine high-pressure cylinder through the flow of improved part of the appraisal meeting. The accreditation committee consists of 25 representatives from 24 units. Participants listened to the improvement design, manufacture and test of the project by Xi’an Institute of Thermal Engineering, Beijing Electric Power Equipment General Factory and Qinling Power Plant, as well as the report on the practical application of the pilot unit on Qinhuangdao Power Plant PM2. Conducted a serious discussion, unanimously passed the certificate of technical appraisal. Identification will be that the type of high-pressure cylinder after the unit with wide - narrow