论文部分内容阅读
这些建设中的景象并不多见:在输电线路开挖铁塔基坑时,把生熟土分层定点堆放,基础浇制完毕后分层回填,自然植被、土地很快得到恢复,铁塔下群众的庄稼长势喜人;基础浇制时,建设混凝土集中搅拌站,采用混凝土集中搅拌运输工艺,甚至实施商品混凝土罐车运输、泵车浇注技术,杜绝了砂、石、水泥对原始生态和老百姓土地的污染,当地政府、群众看在眼里,喜在心里,把开水、西瓜、水果送到基础浇制施工现场。
The construction of the scene is rare: the excavation of the tower in the foundation of the power transmission line, the delineation of raw and cooked soil layering point after the foundation pouring completed layered backfill, natural vegetation, land quickly restored, the masses under the tower When the foundation pouring, the construction of concrete mixing station, the use of concrete mixing process of transport, and even the implementation of commercial concrete tanker transport, pump pouring technology to eliminate the sand, stone, cement on the original ecology and people’s land pollution The local government, the masses look in the eyes, hi in the heart, the water, watermelon, fruit poured to the foundation construction site.