加强项目现场签证管理,有利于规范项目工作流程,有效控制成本,并确保工程质量和工作进度。那么该如何减少签证并进行签证管理呢?现场签证的诱因1.设计变更(1)设计类原因(1)设计优化影响出图日期,进而影响进度;(2)设计错误未及时发现,引起返工;(3)设计缺漏引起返工、增补;(4)补充设计引起工作量增加;(5)二次设计(如精装修等)引起原工作的返工或废弃。(2)现场施工类原因
Strengthening visa management at the project site is conducive to standardizing project workflow, effectively controlling costs and ensuring project quality and work progress. So how to reduce the visa and visa management? Site incentives 1. Design changes (1) Design reasons (1) design optimization affect the plot date, thereby affecting the progress; (2) design errors are not found in time, causing rework ; (3) design gaps caused by rework, supplement; (4) additional design caused by increased workload; (5) secondary design (such as fine decoration, etc.) caused the original work of rework or abandoned. (2) Site construction category reasons