中国水电建設降低造价的几个主要問題——苏联水电专家尤里諾夫、塔拉洛夫在全国水利电力会議上的发言

来源 :水利与电力 | 被引量 : 0次 | 上传用户:kkkk8043
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
首先应該指出的是:不能把水电站只看成是电网內的备用容量,只負担火电站的尖峰負荷;水电站完全有权被看做是电力工业的主要的生产电力的企业。在一些国家,几乎全部的用电是由水电站来滿足的: 加拿大水电占总发电量的96%日本水电占总发电量的74%意大利水电占总发电量的77%瑞典水电占总发电量的88%挪威水电占总发电量的99% First of all, it should be pointed out that the hydropower station cannot be regarded as only the backup capacity in the power grid, but only the peak load of the thermal power station; the hydropower station has the right to be regarded as the main power production enterprise in the power industry. In some countries, almost all electricity use is met by hydropower stations: Canada’s hydropower accounts for 96% of total power generation. Japan’s hydropower accounts for 74% of total power generation. Italy’s hydropower accounts for 77% of total power generation. Swedish hydropower accounts for total power generation. 88% of Norwegian hydropower accounts for 99% of total electricity generation
其他文献
美国《玻璃工业》杂志编辑访问了匹茨堡平板玻璃公司技术服务部副主任 John B.While。问:现在人们常常认为平扳玻璃工业已经成熟,这是否表示平板玻璃工业今后将不会有 The
“反求工程”是发展科技成果的重要研究方法之一,也是将技术成果转化为生产力的重要科学方法之一。所谓“反求工程”,就是人们对引进的国外产品设备进行全面剖析,分析研究它
日本有关部门8月1日召开会议,审议并确定了水泥工业改革的基本方案。该方案主要内容有: ①1985年底以前淘汰生产能力为3000万吨的水泥窑; ②设立五家共同事业公司,以促进生
男人站在路边,心莫名地疼了一下。这是一条刚刚硬化不久的乡村公路。男人上一次回村里,这条路还泥泞不堪,现在这条路已经变得笔直平坦,黝黑的沥青路面上铺满清晨的阳光。男人
1983年2月28日至3月1日石油工程建设质量管理协会和石油施工企业管理协会在北京联合召开了成立大会和第一次年会。应邀参加大会的有上级有关协会、部门领导同志以及一些大专
加拿大的凯湖不整合脉型矿床已于1983年10月3日正式投产。在试生产过程中,已经生产出75万磅U_3O_8。凯湖矿床的铀矿石有三个来源:加特纳、德尔曼和柯贝尔矿体。矿石平均品位
由机械工业部机械工业自动化科技情报网主办、安徽省机械研究所承办的“一位微处理机讲习会”于1983年10月7日至10月18日在安徽省合肥市召开。这次讲习会由机械部北京机械工
数以千计的县办水泥企业,是我国建材工业的重要组成部分。通过近几年的企业整顿,县办水泥企业的技术、经营管理及人员素质大有提高。产量持续上升,扭亏增盈成效显著,产品质
同志們: 我們的会議开了半个月。我們的会議实际上是全国計划会議的一部分,这种开法很好。經过大会小会的讨論,經过几番平衡和会议領导小組的討論,我現在把最后商定的方案和
一、更新改造资金的使用和管理现状 随着生产的发展和资金供应方式的变化,用于国营工交企业的更新改造资金增长很快。“一五”时期为23亿元,“二五”时期为100亿元“1963—1