论文部分内容阅读
编者的话:李席馀先生是我校校友,1941年毕业于中央大学水利工程系,后赴美国哥伦比亚大学深造,在美国一直从事水利水电工程设计和研究工作。现任美国政府能源部水力发电咨询工程师,美国土木工程学会终生 Fellow 会员及美国东部纽约等州的注册工程师。本文原载于英刊 Water Power & Dam Construction 1986年12月大坝安全专号上,引起美国有关水利类大专院校及水利界的关注,因此作者希望向国内同行介绍。观经我校校友肖天铎先生重新整理成中文稿,在本刊刊出,供国内有关人员参考。
Editor’s Note: Mr. Li Xizhao is an alumnus of the university. He graduated from the Department of Water Conservancy of Central University in 1941, and then went to Columbia University for further studies. He has been engaged in water conservancy and hydropower engineering design and research in the United States. He is currently a consulting engineer for hydroelectric power generation at the US Department of Energy, a Fellow member at the Civil Engineering Society of the United States, and a registered engineer at New York State in the eastern United States. This article was originally published in the British Power Water Dam Dam Safety in December 1986, which attracted the attention of water conservancy colleges and water conservancy circles in the United States. Therefore, the author hopes to introduce it to domestic counterparts. Mr. Xiao Tianjun, a student alumnus of the school, reorganized the manuscripts of Chengzhong and published it in this journal for reference by relevant domestic personnel.