摘 要:本文主要从多个角度探讨了工民建施工中造价管理和控制的问题,特别是工民建施工过程中存在的问题以及相应的策略开展了分析。在工民建造价管理与控制的过程中要做好造价管理不仅仅是要重视对招标文件与施工图纸的研究,同时还要加强对于施工现场的开学管理,在施工材料和设备采购的过程中也要进行严格的控制,控制好施工现场的质量和材料使用情况,合理的使用各种材料,这样才能够有效的降低不必要的施工浪费。
关键字:工民建;工程施工;造价管理
Abstract: This paper mainly discusses the cost management and control in the civil engineering construction from many aspects, especially in civil engineering in the construction process and the corresponding strategies to carry out the analysis. Construction process of price management and control in industry and people to do the cost management is not only to pay attention to the tender documents and construction drawings, but also to strengthen the management of construction site for the school, in the process of construction materials and equipment procurement must also be strict control, good control of the construction site of the quality and use of materials, reasonable use of a variety of materials, so that it can effectively reduce construction waste unnecessary.
Key words: civil engineering; construction; cost management
中圖分类号:TU723.3
工民建工程的施工造价管理一直贯穿于整个工程项目的过程之中,在共勉工程施工的过程中严格的造价管理可以有效的降低工程施工中的各种费用,同时还可以有效的对工程的施工单位和设计单位的各种资源进行优化,从而更好的提升对于资源的利用率。在工民建工程建设施工的过程之中,合理的造价管理是十分必要的,这对于建筑企业经济效益有着直接的影响。同时从工民建工程中的重要环节来讲,施工过程中的造价管理也有着承上启下的重要作用,能够促进企业在施工中健康有序的发展。在工民建的施工具体过程中,影响造价管理的因素是多个层面的,本文主要结合自己的工作实践,分析研究了在工民建施工中开展造价管理的主要原因,并就有效控制工民建施工过程中的造价措施进行了相应的分析研究,以期可以更好的做好工民建工程施工中的造价管理与控制,促进企业经济效率的提升。
一、 在工民建施工造价控制中存在的问题分析
1. 缺失完善的工程造价管理体系
在工民建工程中,很多单位并没有建立起完善的工程造价的管理体系,这是目前造成很多工民建工程施工中出现造价过高的一个十分重要的原因,因为造价管理体系的缺失,很多单位在开展施工的过程中是走一步是一步,这往往会给施工造成大量的浪费。在开展造价管理的过程中,很多单位在管理中与国家的有关规定有很大出入,比如在一些定额的套用之中,不同的地区往往存在着比较大的差异,这就难免会在工民建的工程造价管理方面存在一些不可避免的冲突,从而造成工程造价控制很难达到应有的效果,影响了造价管理在整个工程施工中作用的发挥。
2. 对于工程造价的控制不够重视
在工民建工程施工中一些建设单位对于工程质量的重视程度比较高,在控制工程质量方面花费了很多时间和精力,也制定了相应的制度和措施。但是对于工程造价则重视的程度不高,工程造价并没有能够在整个工程施工中发挥出应有的价值。这样就算是一些单位在工程的施工中制定了一些相应的工程造价的管理措施,因为施工人员对于工程造价的不重视,这样工程造价的制度也很难进行有效的实施。另外,很多施工企业在施工过程中对于自己的施工人员人员不能够做好约束,铺张浪费、返工发生的概率比较高,这直接导致了在工程建设的过程中出现各类经济问题。这些也都是影响有效的工程造价工程的重要因素。
3. 在进行施工的过程中对于材料和设备缺少有效的管理
在工民建工程的施工过程中,设备和材料在整个造价中占有比较大的比重,所以在工作中加强对于材料等费用的控制是十分必要的,但是从目前来看,很多建筑企业在施工中存在着蓄意提高工程材料价格,慌报设备价格的现象,这会给企业带来很大的损失。同时在施工中不注意节约,大批量购买一次性使用的设备,甚至不进行使用的设备,这就大大增加了工程建设中的总费用。长期闲置不但占用施工场地,还会产生折旧,造成企业资产的损失。
二、 有效控制工民建工程施工造价的措施分析
工民建工程施工造价是贯穿于整个工程项目的全过程之中的,在工民建工程的施工过程中开展严格的造价管理不仅仅可以有效的降低工程施工中的各种费用,同时还可以对工程的施工单位和设计单位进行一定的资源优化,从而很好的提升资源的有效利用效率,促进工民建施工企业业绩的提升,因此应当重视工民建施工过程中造价管理和控制的研究,探讨优化造价管理的相关措施,以下结合工作实践,就工民建施工中造价管理的相关问题进行了分析研究。
1. 重视招标文件
工民建工程招标文件中对于工程的各种施工方案和规范进行明确的规定,这些文件对于施工方案的选择会有着一定的影响,进而会影响到施工的费用问题。因此需要对施工中招标文件进行仔细的研究,掌握文件中所涉及到的所有内容,把握重要信息和细节内容。这是因为在招标文件中所涉及到的施工规范在后期是不能够进行随意修改的,但是施工方法的选择则相对要比较灵活。所以要将重点放在对于施工技术的改进上。对于在施工中因为实际情况所不能够实施的施工方法则要进行必要的整改,从而确保在工民建工程中能够选择比较合理的施工方法,减少不必要的费用,提升施工企业的经济效益。
2. 要重视对于施工图纸的审核
在施工的过程中,工程的施工图纸是进行施工最为重要的基础。通过分析施工图纸则可以大概估算施工所需要的总造价。为了能够比较有效的控制整个工程的造价,需要对施工的图纸进行严格的审核,依据施工的图纸估算出整个工程的造价,进而依据施工现场的实际情况计算出实际所需要的工程造价。如果实际的造价要比预算的造价要高,则要做出相应的对策,要对施工的图纸进行更加深入的研究,找出施工图纸所存在的问题,然后进行相应的修改,以确保整个工程造价的合理性和科学性。
3. 加强对于施工过程中材料设备的造价控制
在工民建的施工中材料和设备的支出占到了很大的比例,因此要对这一部分的费用进行严格的控制。首先应该仔细的研究施工的标准,依据工程的实际情况科学的选择所应该使用的材料,不能一味的追求高端产品,也不能贪图便宜,以次充好。其次,采购人员要对建材市场的各种材料和设备非常了解,真正能够做到货比三家,选择价格比合适的材料进行购买使用。最后,要丰富材料采购的形式,可以选择招标的形式进行。在做到对投标企业的资质进行非常严格的审核的基础之上,选择价格合理报价较低的企业。这种方式不仅仅可以使得材料的质量得到一定的保障,还可以有效的降低材料的使用费用。
4. 强化施工的现场管理
要想合理的控制工民建施工造价,还必须要对施工现场进行严格的控制管理。工程造价的管理人员要经常的深入到施工现场去收集相关的资料,对施工现场开展必要的检查,对于施工人员的错误行为和浪费行为进行必要的纠正,对施工中存在的各种问题要及时的汇报。特别要重视对于施工质量的管理,避免不必要的返工现象的发生,从而最大限度的降低施工中的各种费用,促进工民建施工质量的提升。
三、 结语
综上所述,目前影响工民建施工的造价因素是多种多样的,这使得工民建工程施工造价管理不能够很好的发挥实际的作用。本文主要结合工作实践,研究分析了工程造价管理中存在的问题,并提出了相应的加强造价管理的措施。
参考文献
[1]戴雪梅.建筑工程造价控制存在的问题与对策[J].中国城市经济,2010(07).
[2]刘斌.水电工程造价各阶段中存在的问题及控制对策[J].北京水务,2007(04).
[3]缪运兵.工程建设造价控制与对策[J].当代经济(下半月),2008(09).
[4]贾雪梅;丁银生;张利敏;;工程造价咨询机构参与建设项目全过程造价管理的探讨[A];河南省建筑业行业优秀论文集(2009)[C];2009年
[5]孙敏;杨志坚;肖军;;浅谈在项目实施阶段的工程造价管理[A];首届山东材料大会论文集(建筑材料篇)[C];2007年
[6]王燕燕;兰俊;;浅谈造价咨询面临的新课题历——全过程造价管理[A];河南省土木建筑学会2009年学术大会论文集[C];2009年
关键字:工民建;工程施工;造价管理
Abstract: This paper mainly discusses the cost management and control in the civil engineering construction from many aspects, especially in civil engineering in the construction process and the corresponding strategies to carry out the analysis. Construction process of price management and control in industry and people to do the cost management is not only to pay attention to the tender documents and construction drawings, but also to strengthen the management of construction site for the school, in the process of construction materials and equipment procurement must also be strict control, good control of the construction site of the quality and use of materials, reasonable use of a variety of materials, so that it can effectively reduce construction waste unnecessary.
Key words: civil engineering; construction; cost management
中圖分类号:TU723.3
工民建工程的施工造价管理一直贯穿于整个工程项目的过程之中,在共勉工程施工的过程中严格的造价管理可以有效的降低工程施工中的各种费用,同时还可以有效的对工程的施工单位和设计单位的各种资源进行优化,从而更好的提升对于资源的利用率。在工民建工程建设施工的过程之中,合理的造价管理是十分必要的,这对于建筑企业经济效益有着直接的影响。同时从工民建工程中的重要环节来讲,施工过程中的造价管理也有着承上启下的重要作用,能够促进企业在施工中健康有序的发展。在工民建的施工具体过程中,影响造价管理的因素是多个层面的,本文主要结合自己的工作实践,分析研究了在工民建施工中开展造价管理的主要原因,并就有效控制工民建施工过程中的造价措施进行了相应的分析研究,以期可以更好的做好工民建工程施工中的造价管理与控制,促进企业经济效率的提升。
一、 在工民建施工造价控制中存在的问题分析
1. 缺失完善的工程造价管理体系
在工民建工程中,很多单位并没有建立起完善的工程造价的管理体系,这是目前造成很多工民建工程施工中出现造价过高的一个十分重要的原因,因为造价管理体系的缺失,很多单位在开展施工的过程中是走一步是一步,这往往会给施工造成大量的浪费。在开展造价管理的过程中,很多单位在管理中与国家的有关规定有很大出入,比如在一些定额的套用之中,不同的地区往往存在着比较大的差异,这就难免会在工民建的工程造价管理方面存在一些不可避免的冲突,从而造成工程造价控制很难达到应有的效果,影响了造价管理在整个工程施工中作用的发挥。
2. 对于工程造价的控制不够重视
在工民建工程施工中一些建设单位对于工程质量的重视程度比较高,在控制工程质量方面花费了很多时间和精力,也制定了相应的制度和措施。但是对于工程造价则重视的程度不高,工程造价并没有能够在整个工程施工中发挥出应有的价值。这样就算是一些单位在工程的施工中制定了一些相应的工程造价的管理措施,因为施工人员对于工程造价的不重视,这样工程造价的制度也很难进行有效的实施。另外,很多施工企业在施工过程中对于自己的施工人员人员不能够做好约束,铺张浪费、返工发生的概率比较高,这直接导致了在工程建设的过程中出现各类经济问题。这些也都是影响有效的工程造价工程的重要因素。
3. 在进行施工的过程中对于材料和设备缺少有效的管理
在工民建工程的施工过程中,设备和材料在整个造价中占有比较大的比重,所以在工作中加强对于材料等费用的控制是十分必要的,但是从目前来看,很多建筑企业在施工中存在着蓄意提高工程材料价格,慌报设备价格的现象,这会给企业带来很大的损失。同时在施工中不注意节约,大批量购买一次性使用的设备,甚至不进行使用的设备,这就大大增加了工程建设中的总费用。长期闲置不但占用施工场地,还会产生折旧,造成企业资产的损失。
二、 有效控制工民建工程施工造价的措施分析
工民建工程施工造价是贯穿于整个工程项目的全过程之中的,在工民建工程的施工过程中开展严格的造价管理不仅仅可以有效的降低工程施工中的各种费用,同时还可以对工程的施工单位和设计单位进行一定的资源优化,从而很好的提升资源的有效利用效率,促进工民建施工企业业绩的提升,因此应当重视工民建施工过程中造价管理和控制的研究,探讨优化造价管理的相关措施,以下结合工作实践,就工民建施工中造价管理的相关问题进行了分析研究。
1. 重视招标文件
工民建工程招标文件中对于工程的各种施工方案和规范进行明确的规定,这些文件对于施工方案的选择会有着一定的影响,进而会影响到施工的费用问题。因此需要对施工中招标文件进行仔细的研究,掌握文件中所涉及到的所有内容,把握重要信息和细节内容。这是因为在招标文件中所涉及到的施工规范在后期是不能够进行随意修改的,但是施工方法的选择则相对要比较灵活。所以要将重点放在对于施工技术的改进上。对于在施工中因为实际情况所不能够实施的施工方法则要进行必要的整改,从而确保在工民建工程中能够选择比较合理的施工方法,减少不必要的费用,提升施工企业的经济效益。
2. 要重视对于施工图纸的审核
在施工的过程中,工程的施工图纸是进行施工最为重要的基础。通过分析施工图纸则可以大概估算施工所需要的总造价。为了能够比较有效的控制整个工程的造价,需要对施工的图纸进行严格的审核,依据施工的图纸估算出整个工程的造价,进而依据施工现场的实际情况计算出实际所需要的工程造价。如果实际的造价要比预算的造价要高,则要做出相应的对策,要对施工的图纸进行更加深入的研究,找出施工图纸所存在的问题,然后进行相应的修改,以确保整个工程造价的合理性和科学性。
3. 加强对于施工过程中材料设备的造价控制
在工民建的施工中材料和设备的支出占到了很大的比例,因此要对这一部分的费用进行严格的控制。首先应该仔细的研究施工的标准,依据工程的实际情况科学的选择所应该使用的材料,不能一味的追求高端产品,也不能贪图便宜,以次充好。其次,采购人员要对建材市场的各种材料和设备非常了解,真正能够做到货比三家,选择价格比合适的材料进行购买使用。最后,要丰富材料采购的形式,可以选择招标的形式进行。在做到对投标企业的资质进行非常严格的审核的基础之上,选择价格合理报价较低的企业。这种方式不仅仅可以使得材料的质量得到一定的保障,还可以有效的降低材料的使用费用。
4. 强化施工的现场管理
要想合理的控制工民建施工造价,还必须要对施工现场进行严格的控制管理。工程造价的管理人员要经常的深入到施工现场去收集相关的资料,对施工现场开展必要的检查,对于施工人员的错误行为和浪费行为进行必要的纠正,对施工中存在的各种问题要及时的汇报。特别要重视对于施工质量的管理,避免不必要的返工现象的发生,从而最大限度的降低施工中的各种费用,促进工民建施工质量的提升。
三、 结语
综上所述,目前影响工民建施工的造价因素是多种多样的,这使得工民建工程施工造价管理不能够很好的发挥实际的作用。本文主要结合工作实践,研究分析了工程造价管理中存在的问题,并提出了相应的加强造价管理的措施。
参考文献
[1]戴雪梅.建筑工程造价控制存在的问题与对策[J].中国城市经济,2010(07).
[2]刘斌.水电工程造价各阶段中存在的问题及控制对策[J].北京水务,2007(04).
[3]缪运兵.工程建设造价控制与对策[J].当代经济(下半月),2008(09).
[4]贾雪梅;丁银生;张利敏;;工程造价咨询机构参与建设项目全过程造价管理的探讨[A];河南省建筑业行业优秀论文集(2009)[C];2009年
[5]孙敏;杨志坚;肖军;;浅谈在项目实施阶段的工程造价管理[A];首届山东材料大会论文集(建筑材料篇)[C];2007年
[6]王燕燕;兰俊;;浅谈造价咨询面临的新课题历——全过程造价管理[A];河南省土木建筑学会2009年学术大会论文集[C];2009年