北京空间飞行器总体设计部通过建章立制建立了统一的风险管理流程,构建了型号项目通用风险树以及风险评估准则,同时在加强风险管理信息化建设的基础上开发了型号项目风险管理系统,实现了风险管理的全员参与、动态监控和知识传承,有效提升了型号项目风险管理的整体水平。
The general design department of Beijing Space Vehicle established a unified risk management process through the establishment of a system of rules and regulations, built a generic risk tree of model projects and risk assessment criteria, and at the same time developed a model project risk management system based on the strengthening of risk management information construction. All staff involved in risk management, dynamic monitoring and knowledge inheritance were realized, effectively raising the overall level of risk management in the model project.