论文部分内容阅读
在城市新建开发区初期的临时用水问题上,对加压设施的选择作了初步研究,并介绍了智能型箱泵一体化泵站在类似工程中的设计、施工等具体内容。
The preliminary study on the selection of pressurizing facilities on the temporary water use in the new development zone of the city has been carried out. The design and construction of the smart pump integrated pumping station in similar projects are also introduced.