江苏省将在今后3年加快建设一批火力电源点,同时优化调整电源结构,继续完善电网结构,提高输配电能力。这些电源点项目包括:太仓港电厂、彭城电厂、谏壁电厂、夏港电厂、华能淮阴电厂、新海电厂、天生港电厂、南京苏源热电厂、徐塘电厂、徐州电厂、扬州电厂等2×30万kW 电厂项目,在2005年底前投产,争取“十五”后两年新增30万kW 机组装机容量750万kW;建成常熟电厂,新增60万kW 机组装机容量120万kW,抓紧开工建设华能苏州工业园区电厂、张家港沙洲电厂、利港电厂三期、常州江边电厂、镇江高资电厂、扬州二电厂二期、吕四电厂等60万kW 电厂项目,在“十一五”初期投产60万kW 机组装机容量720万kw。
Jiangsu Province will speed up the construction of a number of power supply points in the next three years while optimizing and adjusting the power supply structure and continuing to improve the power grid structure and increase the transmission and distribution capacity. These power points include: Taicang Port Power Plant, Pengcheng Power Plant, Jianbi Power Plant, Xiaogang Power Plant, Huaneng Huinin Power Plant, Xinhai Power Plant, Tianshenggang Power Plant, Nanjing Suyuan Thermal Power Plant, Xu Tong Power Plant, Xuzhou Power Plant, Yangzhou Power Plant and other 2 × 30 10000 kW power plant project, put into operation before the end of 2005, for the “two five years after the new” 300,000 kW unit installed capacity of 7.5 million kW; Changshu power plant built, the new 600,000 kW unit installed capacity of 1.2 million kW, pay close attention to start construction Huaneng Suzhou Industrial Park Power Plant, Zhangjiagang Shazhou Power Plant, Li Gang Power Plant Phase III, Changzhou Jiangbian Power Plant, Zhenjiang High-power Plant, Yangzhou Second Power Plant Phase II, Lusi Power Plant and other 600,000 kW power plant project, put into operation in the “Eleventh Five-year” 600,000 kW unit installed capacity of 7.2 million kw.