摘要:配电网络的供电安全可靠,直接关系到用户的用电安全,更关系到整个区域的发展。同时配电网络是电网的基础,在整个电网中十分重要。本文结合了农村配电网现存的具体问题做出了简要的分析,并以10kV配电网规划建设为具体实例,着重对配电网规划做出了分析,并提出了相关建议。
关键词:农村配网规划;供电可靠性;安全管理
Abstract: the supply of power distribution network safe, reliable, and directly related to a user's electricity safety, more related to the development of the whole region. At the same time distribution network is the foundation of the power grid, in the whole in the power is very important. Based on the existing problems of rural power distribution network specific made brief analysis, and with 10 kV power distribution network planning and construction for specific examples, the paper made analysis for distribution network planning, and puts forward related Suggestions.
Keywords: rural distribution network planning; The power supply reliability; Safety management
中圖分类号:G812.42文献标识码:A 文章编号:
引言
近年来,随着我国电力事业的飞速发展,对电网建设的要求越来越高,供电网络建设为了满足我国电力事业的发展需求,要不断地加大电网建设力度,并且不断地提高电网建设的标准。
从国网公司到县级供电公司,对配电网建设非常关注,投入资金逐年递增,特别是“三集五大”后,县公司的主要任务就是建设和运行更坚强的配电网,要做精做强配电网。之前,各单位已经编制了配电网规划,但是因技术力量的问题,没有经过专业的、系统的规划,配电网规划的深度不够,含金量低,目前在实施过程中存在很大的弊端。
配电网工程大规模建设从2010年---2012年已经三个年头,因没有一个完善的总的统筹规划,导致部分工程项目的可行性大为降低,与地方经济发展、地方整体规划相矛盾,特别是县域范围内的各变电站10(20)kV不同出线之间手拉手供电、同一个变电站不同出线之间的手拉手供电,以及按乡镇地域、高速路、铁路等分区供电项目未能统筹考虑。部分项目设计标准低,未预留足够的扩用回路,特别是变电站的出口处占用线路通道,严重影响日后的负荷增长需求,导致线路通道无法开辟,最终造成重复投资,费工、费力、费资金。本文将根据具体规划要求,对配电网规划工作做出相关阐述。
1农村配电网现状存在的问题分析
结合当前农村配电网的实际情况,对其存在的主要问题进行以下总结:1)布局和结构的不合理:农村配网的难点体现在网架结构上。由于近年来,生活水平的不断提高,使得配网负荷快速增长,这也给农村配网造成了相当大的压力。因此引发了不少问题,如一些设备由于过负荷而发生故障,造成用户电压不稳定;在配电网中,线路迂回供电或超供电半径范围供电;网络损耗过大,故障发生频繁等问题。2)配电网改造工程规划和工程配套问题:体现为配电网改造工程前期的规划负荷与实际负荷不尽相同;在改造接户线时,忽略了三相负荷的平衡工作,增加了线损和电压降和增大变压器的发热。3)配电变压器配置不合理:体现为在某些地区出现不少有关配电变压器容量与实际用电负荷不匹配的情况,这造成配变负荷没有在经济运行区间,这些不合理配置造成配网运行存在一定安全隐患,如配电变压器空载运行时间长,固定损耗大。4)运行管理人员对新设备不够熟悉:由于城乡配电网改造后,配网上采用了许多新技术、新设备、新材料。但由于运行管理人员的知识有限,引发不少问题,如线路采用几回路同杆架设方式多了;由于线路加了隔断设备,线路分段增多;部分配电线路采用了电缆和开闭所等供电设备。5)其他线损问题,这是由于以前农村电网布局不规范造成的。另一点由于社会的发展需求,不少大型企业纷纷落户农村,企业的设备现代化、大型化、自动化,使企业成了电能消耗大户。因此,造成电网中无功功率增大,出现高次谐
波,造成电网电流、电压波形发生畸变,严重时甚至影响电气设备的安全运行。针对以上问题,以下将从配网的规划和安全管理方面进行重点探讨。
2配电网的规划要点
2.1调整线路运行电压及配变容量
主要是实现配电经济合理运行,可根据以下情况进行规划:1)根据负荷情况,调节线路的电压,即调节变电所的主变分接头来使线路的电压始终运行在一个经济合理的水平上。在低谷负荷时,可适当降低电压,使其接近下限运行;在高峰负荷时,可变损耗占总损耗比例较大,可适当提高电压使其接近上限运行。2)在农网中,因为配变容量的选择和安装位置不尽合
理,造成配电变压器运行不经济,加上农村用电负荷“季节性强、峰谷差大,全年轻载甚至空载时长等因素造成损耗大。所以一定要合理选型和调整配变容量,提高配变负荷率。营与管理
2.2重视对谐波的治理
为了实现电能品质的改善,提高电器设备的运行稳定性,减少系统损耗,应做好供电电网的无功补偿及谐波治理。若为了防止由于幅值变化较大且伴有多次谐波的大功率冲击型负荷的情况,而出现电网电压、电流波形畸变较大的现象,应选用兼有谐波治理功能的动态无功补偿装置。一般来说,可借助两条途径来抑制谐波,其一为应用谐波补偿装置;其二为应用不
产生谐波的电力电子装置。
2.3运用多种方式设计线路
为了实现农网无功分层、分区、就地平衡,进一步降低线损,节约能源,可通过推广农村电网全网无功优化及控制系统技术,从而实现无功电源和无功补偿最优化。农村配网地域广,
大多数新增供电台区能有效地新增布点,可灵活运用多种方式设计,线路敷设可上墙、可入地,通道少的可提前预留或提前架设线路。
3 配电网目标网架结构分析
3.1“以电源点为中心,分布配置K型站”的原则对于正处在快速发展期的配电网络,由于现有电源点布点缺乏,10kV出线仓位过少,小容量中压用户占用变电站10kV仓位过多,导致变电站10kV仓位利用率低下。
考虑到10kVK型站接线方式清晰、灵活,其出线带继电保护,且10kV母线带自切,故障点判断容易,可较快实现负荷转移,具备较强的负荷释放能力,故在优化10kV配电网结构的过程中,应该坚持“以电源点为中心,分布配置K型站”的原则.
3.2配电网“分层分区、适度交错”的原则长期以来,10kV配电网网架一直存在着错综复杂、参差不齐的混沌状态,这给配电网的运行带来很大的隐患,其主要原因是地区发展不平衡,配电网网架结构没有一个统一的规划原则。在配网规划中,应该按照“分层分区、适度交错”的原则,理顺配电网层次结构,明确区块性质,做到结构合理,避免不同性质的配网结构无序交错。
将配电网分为2个层次:层次一由10kV专线、P型站(开环点前)、K型站及架空线主干线组成;层次二由P型站(开环点后)、K型站至P型站及10kV用户、架空线支线及杆变等组成。按此结构区分,层次比较清晰,结构较为明确。将配电网络按区域性质分为“电缆网络”及“架空网络”,在具体规划工作中,应注意电缆网络及架空网络的适度交错,以“简单易行,利于运行”为原则,避免过度复杂的网络结构。
3.3配电网目标网架结构目标网架结构应按照“分层分区”的思想,形成层次清晰、简洁明确的网架结构。对于架空网络,根据架空网络的发展阶段,采取各种方案改造,确保调度运行灵活,负荷转移方便。
对于电缆网络,在具体发展过程中,必须做好配电网发展的过渡方案,尤其对于环网接线,应有近期及远期的相应方案,对于规划方向不甚明确、环网成环可能性较小的地块,不宜采用环网接线。在电缆网络分层结构中,K型站起着“节点”的作用,在实际建设过程中,宜引导用户集中建设,并以K型站方式为主体,避免日后大规模改造。K型站规划容量不宜超过12000kVA,K型站单条出线负荷控制在4000kVA及以下,P型站则接2000kVA及以下大用户。
4配电网建设的关键
4.1 10kV架空线分期建设方案10kV架空线宜采用多分段三联络的连接方式,达到“手拉手”和“N-1”原则。在架空网络建设完善过程中,须注意分段建设及过渡方案的考虑。①在初期负荷较轻的情况下,可采用“一分段一联络”方式,每回线路负载率宜不大于50%;②当线路负载率达到67%左右,考虑采用“二分段二联络”方式;③最终负载率以75%为宜,采用“多分段三联络”方式。以上不同方式应该是循序渐进、逐步优化的过程,并根据附近电源点的情况因地制宜、适度发展。
4.2环网的过渡方案对于环网接线方式,应避免主回路电缆迂回,且主回路的环网节点不宜过多,力求缩短主回路成环的建设周期。
考虑到地区发展的阶段性,环网接线模式应考虑过渡方案。在初期,考虑采用单环网接线模式,两条线路负载率不超过50%;随着地区发展,可考虑形成多分段两联络,每条线路负载率不超过67%,提高线路利用率;随着负荷进一步发展,可考虑建设第二环,采用双环网接线。
4.3 K型站配置的数量变电站建设与K型站设置的关系与K型站所供负荷、变电站主变容量、变电站的供电能力、直供用户和K型站所供负荷在变电站所供总负荷中的比例有关。
在远期配电网络规划时,变电站主变容量为20MVA,平均每段母线可配置1~2座K型站;变电站主变容量为31.5MVA,平均每段母线可配置2~3座K型站;变电站主变容量为40MVA,平均每段母线可配置3~4座K型站。具体需视地区具体情况而定。
4.4 K型站进出线的控制在电网建设的初期,电源不足是电网建设的主要矛盾。此时,可在地区内设置K型站,延伸10kV母线,增加10kV仓位,利用K型站取得的较好负荷释放能力。当负荷发展一定程度后,考虑改接K型站的进线电源,并尽量实现K型站电源来自2个不同的变电站,形成一定的负荷转供能力,以提高现状变电站的供电能力。
一般而言,建议K型站所供最大容量控制在12000KVA以下。K型站出线若采用辐射接线模式,10kV出线数量可控制在6~12回;若采用环网接线模式,可控制在4~6回。在实际操作中,需视地区内用户、P型站或箱变的数量和容量的具体情况,灵活确定K型站10kV出线数量。
5结语
随着国民经济的发展和人民物质文化生活的不断提高,社会对电力需求逐年增长,对供电质量和供电可靠性要求越来越高,其中10kV中壓配电网网架的建设更是直接关系到用户的供电质量及可靠性水平,意义重大。10kV目标网架的建设不可能一蹴而就,但必须制定相关的标准、建立相应的原则。在相关原则及标准的指引下,对配电网的相关指标做阶段性分析及评价,找出配电网存在的不足,并明确下一步改造及发展的目标。
参考文献
[1]国家电网公司配电网管理规范.2009.
[2]中国电力行业标准城市中低压配电网改造技术导则.1996.
[3]江苏省电力公司县级城市中低压配电网建设与改造技术导则:试行.2001.
关键词:农村配网规划;供电可靠性;安全管理
Abstract: the supply of power distribution network safe, reliable, and directly related to a user's electricity safety, more related to the development of the whole region. At the same time distribution network is the foundation of the power grid, in the whole in the power is very important. Based on the existing problems of rural power distribution network specific made brief analysis, and with 10 kV power distribution network planning and construction for specific examples, the paper made analysis for distribution network planning, and puts forward related Suggestions.
Keywords: rural distribution network planning; The power supply reliability; Safety management
中圖分类号:G812.42文献标识码:A 文章编号:
引言
近年来,随着我国电力事业的飞速发展,对电网建设的要求越来越高,供电网络建设为了满足我国电力事业的发展需求,要不断地加大电网建设力度,并且不断地提高电网建设的标准。
从国网公司到县级供电公司,对配电网建设非常关注,投入资金逐年递增,特别是“三集五大”后,县公司的主要任务就是建设和运行更坚强的配电网,要做精做强配电网。之前,各单位已经编制了配电网规划,但是因技术力量的问题,没有经过专业的、系统的规划,配电网规划的深度不够,含金量低,目前在实施过程中存在很大的弊端。
配电网工程大规模建设从2010年---2012年已经三个年头,因没有一个完善的总的统筹规划,导致部分工程项目的可行性大为降低,与地方经济发展、地方整体规划相矛盾,特别是县域范围内的各变电站10(20)kV不同出线之间手拉手供电、同一个变电站不同出线之间的手拉手供电,以及按乡镇地域、高速路、铁路等分区供电项目未能统筹考虑。部分项目设计标准低,未预留足够的扩用回路,特别是变电站的出口处占用线路通道,严重影响日后的负荷增长需求,导致线路通道无法开辟,最终造成重复投资,费工、费力、费资金。本文将根据具体规划要求,对配电网规划工作做出相关阐述。
1农村配电网现状存在的问题分析
结合当前农村配电网的实际情况,对其存在的主要问题进行以下总结:1)布局和结构的不合理:农村配网的难点体现在网架结构上。由于近年来,生活水平的不断提高,使得配网负荷快速增长,这也给农村配网造成了相当大的压力。因此引发了不少问题,如一些设备由于过负荷而发生故障,造成用户电压不稳定;在配电网中,线路迂回供电或超供电半径范围供电;网络损耗过大,故障发生频繁等问题。2)配电网改造工程规划和工程配套问题:体现为配电网改造工程前期的规划负荷与实际负荷不尽相同;在改造接户线时,忽略了三相负荷的平衡工作,增加了线损和电压降和增大变压器的发热。3)配电变压器配置不合理:体现为在某些地区出现不少有关配电变压器容量与实际用电负荷不匹配的情况,这造成配变负荷没有在经济运行区间,这些不合理配置造成配网运行存在一定安全隐患,如配电变压器空载运行时间长,固定损耗大。4)运行管理人员对新设备不够熟悉:由于城乡配电网改造后,配网上采用了许多新技术、新设备、新材料。但由于运行管理人员的知识有限,引发不少问题,如线路采用几回路同杆架设方式多了;由于线路加了隔断设备,线路分段增多;部分配电线路采用了电缆和开闭所等供电设备。5)其他线损问题,这是由于以前农村电网布局不规范造成的。另一点由于社会的发展需求,不少大型企业纷纷落户农村,企业的设备现代化、大型化、自动化,使企业成了电能消耗大户。因此,造成电网中无功功率增大,出现高次谐
波,造成电网电流、电压波形发生畸变,严重时甚至影响电气设备的安全运行。针对以上问题,以下将从配网的规划和安全管理方面进行重点探讨。
2配电网的规划要点
2.1调整线路运行电压及配变容量
主要是实现配电经济合理运行,可根据以下情况进行规划:1)根据负荷情况,调节线路的电压,即调节变电所的主变分接头来使线路的电压始终运行在一个经济合理的水平上。在低谷负荷时,可适当降低电压,使其接近下限运行;在高峰负荷时,可变损耗占总损耗比例较大,可适当提高电压使其接近上限运行。2)在农网中,因为配变容量的选择和安装位置不尽合
理,造成配电变压器运行不经济,加上农村用电负荷“季节性强、峰谷差大,全年轻载甚至空载时长等因素造成损耗大。所以一定要合理选型和调整配变容量,提高配变负荷率。营与管理
2.2重视对谐波的治理
为了实现电能品质的改善,提高电器设备的运行稳定性,减少系统损耗,应做好供电电网的无功补偿及谐波治理。若为了防止由于幅值变化较大且伴有多次谐波的大功率冲击型负荷的情况,而出现电网电压、电流波形畸变较大的现象,应选用兼有谐波治理功能的动态无功补偿装置。一般来说,可借助两条途径来抑制谐波,其一为应用谐波补偿装置;其二为应用不
产生谐波的电力电子装置。
2.3运用多种方式设计线路
为了实现农网无功分层、分区、就地平衡,进一步降低线损,节约能源,可通过推广农村电网全网无功优化及控制系统技术,从而实现无功电源和无功补偿最优化。农村配网地域广,
大多数新增供电台区能有效地新增布点,可灵活运用多种方式设计,线路敷设可上墙、可入地,通道少的可提前预留或提前架设线路。
3 配电网目标网架结构分析
3.1“以电源点为中心,分布配置K型站”的原则对于正处在快速发展期的配电网络,由于现有电源点布点缺乏,10kV出线仓位过少,小容量中压用户占用变电站10kV仓位过多,导致变电站10kV仓位利用率低下。
考虑到10kVK型站接线方式清晰、灵活,其出线带继电保护,且10kV母线带自切,故障点判断容易,可较快实现负荷转移,具备较强的负荷释放能力,故在优化10kV配电网结构的过程中,应该坚持“以电源点为中心,分布配置K型站”的原则.
3.2配电网“分层分区、适度交错”的原则长期以来,10kV配电网网架一直存在着错综复杂、参差不齐的混沌状态,这给配电网的运行带来很大的隐患,其主要原因是地区发展不平衡,配电网网架结构没有一个统一的规划原则。在配网规划中,应该按照“分层分区、适度交错”的原则,理顺配电网层次结构,明确区块性质,做到结构合理,避免不同性质的配网结构无序交错。
将配电网分为2个层次:层次一由10kV专线、P型站(开环点前)、K型站及架空线主干线组成;层次二由P型站(开环点后)、K型站至P型站及10kV用户、架空线支线及杆变等组成。按此结构区分,层次比较清晰,结构较为明确。将配电网络按区域性质分为“电缆网络”及“架空网络”,在具体规划工作中,应注意电缆网络及架空网络的适度交错,以“简单易行,利于运行”为原则,避免过度复杂的网络结构。
3.3配电网目标网架结构目标网架结构应按照“分层分区”的思想,形成层次清晰、简洁明确的网架结构。对于架空网络,根据架空网络的发展阶段,采取各种方案改造,确保调度运行灵活,负荷转移方便。
对于电缆网络,在具体发展过程中,必须做好配电网发展的过渡方案,尤其对于环网接线,应有近期及远期的相应方案,对于规划方向不甚明确、环网成环可能性较小的地块,不宜采用环网接线。在电缆网络分层结构中,K型站起着“节点”的作用,在实际建设过程中,宜引导用户集中建设,并以K型站方式为主体,避免日后大规模改造。K型站规划容量不宜超过12000kVA,K型站单条出线负荷控制在4000kVA及以下,P型站则接2000kVA及以下大用户。
4配电网建设的关键
4.1 10kV架空线分期建设方案10kV架空线宜采用多分段三联络的连接方式,达到“手拉手”和“N-1”原则。在架空网络建设完善过程中,须注意分段建设及过渡方案的考虑。①在初期负荷较轻的情况下,可采用“一分段一联络”方式,每回线路负载率宜不大于50%;②当线路负载率达到67%左右,考虑采用“二分段二联络”方式;③最终负载率以75%为宜,采用“多分段三联络”方式。以上不同方式应该是循序渐进、逐步优化的过程,并根据附近电源点的情况因地制宜、适度发展。
4.2环网的过渡方案对于环网接线方式,应避免主回路电缆迂回,且主回路的环网节点不宜过多,力求缩短主回路成环的建设周期。
考虑到地区发展的阶段性,环网接线模式应考虑过渡方案。在初期,考虑采用单环网接线模式,两条线路负载率不超过50%;随着地区发展,可考虑形成多分段两联络,每条线路负载率不超过67%,提高线路利用率;随着负荷进一步发展,可考虑建设第二环,采用双环网接线。
4.3 K型站配置的数量变电站建设与K型站设置的关系与K型站所供负荷、变电站主变容量、变电站的供电能力、直供用户和K型站所供负荷在变电站所供总负荷中的比例有关。
在远期配电网络规划时,变电站主变容量为20MVA,平均每段母线可配置1~2座K型站;变电站主变容量为31.5MVA,平均每段母线可配置2~3座K型站;变电站主变容量为40MVA,平均每段母线可配置3~4座K型站。具体需视地区具体情况而定。
4.4 K型站进出线的控制在电网建设的初期,电源不足是电网建设的主要矛盾。此时,可在地区内设置K型站,延伸10kV母线,增加10kV仓位,利用K型站取得的较好负荷释放能力。当负荷发展一定程度后,考虑改接K型站的进线电源,并尽量实现K型站电源来自2个不同的变电站,形成一定的负荷转供能力,以提高现状变电站的供电能力。
一般而言,建议K型站所供最大容量控制在12000KVA以下。K型站出线若采用辐射接线模式,10kV出线数量可控制在6~12回;若采用环网接线模式,可控制在4~6回。在实际操作中,需视地区内用户、P型站或箱变的数量和容量的具体情况,灵活确定K型站10kV出线数量。
5结语
随着国民经济的发展和人民物质文化生活的不断提高,社会对电力需求逐年增长,对供电质量和供电可靠性要求越来越高,其中10kV中壓配电网网架的建设更是直接关系到用户的供电质量及可靠性水平,意义重大。10kV目标网架的建设不可能一蹴而就,但必须制定相关的标准、建立相应的原则。在相关原则及标准的指引下,对配电网的相关指标做阶段性分析及评价,找出配电网存在的不足,并明确下一步改造及发展的目标。