论文部分内容阅读
本文针对调峰水电厂的运行特点提出了一套调峰水电厂实时机组组合方案的计算方法。本文的方法既可以获得较优的机组组合方案,又具有足够快的实时响应速度。
In this paper, according to the operational characteristics of peak-shaving hydropower plant, a set of calculation method of real-time unit combination plan is proposed. The method in this paper can not only get a better combination of units, but also have fast real-time response speed.