该桥全长14公里,桥面高出海面60m,除了通航孔径为300m及200m跨度的钢箱形梁以外,有7884m长的预应力混凝土箱形梁(每跨长度80m)。该桥基桩、墩台及预应力混凝土箱形梁等共计有400,000m~3混凝土。所需的150,000t水泥,都是用7,000t的船从海上运来。为了解决水泥的存储、运送问题,采用了以下几种特殊设备。
The bridge, which is 14 kilometers in length and 60 meters above the deck, has a 7,884-m-long prestressed concrete box girder (each span length of 80 meters), except for steel box girders with 300m and 200m navigable apertures. The bridge foundation piles, abutments and prestressed concrete box girders total 400,000m ~ 3 concrete. The 150,000 tons of cement needed were shipped by sea from a 7,000-tonne ship. In order to solve the storage of cement, shipping problems, using the following special equipment.