大朝山水电站位于云南省西部云和县和景东县交界处的澜沧江上,是澜沧江中下游河段紧接漫湾水电站的下一个梯级电站,距昆明630km。大朝山水电站以发电为主,地下厂房内共装设6台水轮发电机组,单机容量225MW,总装机容量1350WM。电站采用500kV 和220kV 两级电压接入云南省电网,是系统的主要调峰电源。电站动态投资概算88.7亿元,由国家开发投资公司,云南红塔实业有限责任公司、云南省开发
Dachaoshan Hydropower Station is located on the Lancang River at the junction of Yunhe County and Jingdong County in the western part of Yunnan Province. It is the next cascade hydropower station in the middle and lower reaches of the Lancang River, which is 630km away from Kunming. Dachaoshan Hydropower Station to power generation, underground power plant installed a total of 6 hydroelectric generating units, single capacity of 225MW, the total installed capacity of 1350WM. Power station using 500kV and 220kV two levels of voltage access to Yunnan power grid, the system is the main peak power supply. The dynamic investment budget of 8.87 billion yuan, by the State Development and Investment Corporation, Yunnan Hongta Industrial Co., Ltd., Yunnan Province Development