论文部分内容阅读
冶金部安全技术研究所六室道口安全组综合国内外资料,于1982年7月根据武钢焦化厂道口接近区段短、调车作业频繁,瞭望条件差等具体情况,提出了无线遥控自动化道口方案。经过一年多的研制,1983年5月将全套设备安装于武钢焦化厂,8月投入试运行。试运行证明,设备稳定可靠,适用于各种调车作业情况。平时道口信号机绿灯亮,道口栏杆处在与水平面约成65°角位置,表示道口开放。当
Ministry of Metallurgical Safety Institute of six-room crossing safety group integrated domestic and international data, in July 1982 under the Wisco Coking Plant Road Crossings close to the section short, shunting operations frequently, looking poor conditions and other specific circumstances, put forward a wireless remote control crossing the program . After more than a year of research and development, in 1983 May will be a full set of equipment installed in Wuhan Iron and Coking Plant, put into trial operation in August. Proved to run, the equipment is stable and reliable, suitable for a variety of shunting operations. The traffic lights at the level crossing usually light, railings at the crossing at an angle of about 65 ° with the horizontal, indicating that the crossing is open. when