目前,我国一些轨道公司开始以欧盟RAMS标准为依据,进行安全过程控制的探索,在应用中存在一定的局限性,RAMS标准的初衷是仅应用于机电系统,并非针对城市轨道交通的建设运营全过程。有鉴于此,提出适合我国国情的RAMS流程,将系统按任务划分为策划、初步隐患分析、制定各子系统安全要求、详细隐患分析、各子系统执行安全计划、系统安全调试、系统安全验收、系统安全试运营、系统安全运营、退役和报废共10个阶段,这一流程划分继承了RAMS理念中核心的风险管理和全过程控制的优点,规范了城市轨道交通系统安全过程控制,规定了建设过程中必须进行的强制性工作,采取超前预防模式,实现了系统安全过程控制和安全评价的结合。
At present, some track companies in our country start to explore the control of the safety process based on the EU RAMS standard. There are some limitations in the application. The original intention of the RAMS standard is only applied to the electromechanical system, not for the construction and operation of urban rail transit process. In view of this, put forward the RAMS process that suits our national conditions, divide the system into tasks according to tasks, analyze the preliminary hidden danger, make the safety requirements of each subsystem, analyze the hidden danger in detail, implement the safety plan of each subsystem, debug safety of the system, System safety trial operation, system safe operation, decommissioning and scrapping. This process division inherits the core risk management and full-process control advantages of RAMS concept, standardizes the safety control of urban rail transit system, stipulates the construction Mandatory work must be carried out in the process, take the advanced prevention mode, to achieve a combination of system safety process control and safety evaluation.