丹东港航工程技术问题商榷

来源 :丹东海工 | 被引量 : 0次 | 上传用户:csj123
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
自上世纪七十年代开始大东港建设可行性研究工作至今,有几次工程技术工作的重大错误,值得我丹东海工的同志高度重视,这里首先分析即将建设的大东港第7、8号泊位的位置设计的不当。 1.大东港第7、8泊位的布置及将出现的问题自八十年代建设大东港第3泊位开始,遵循着一条微弯形的整治线建设,使涨落潮两个动力顺整治线方向作用,促进港池水深微冲,水流动力大于泥沙起动流速,顺应河口水流的客观规律,保证了大东港万 Since the seventies of last century began the feasibility study of the construction of Dadong Port so far, there are several major errors in engineering and technical work, it is worth my comrades Dandong sea workers attach great importance to here first analyze the upcoming construction of Dadong port No. 7,8 The location of the design is not appropriate. 1. Dadonggang berths 7,8 berths and the problems that will arise Since the construction of the Big Dong port berths in the eighties began, followed by a micro-bend-shaped renovation of the construction line, so that the ups and downs of two power along the direction of the rectification line Role, to promote basin deep micro-red water, water flow is greater than the velocity of sediment start-up, follow the objective laws of the estuary water flow to ensure that the Dadongwan million
其他文献
由于复杂的工程结构和特殊的地质条件,使长江三峡水利枢纽永久船闸地下输水系统在建设过程中,遇到了诸多出乎意料的标外项目。承担该工程施工任务的承包商对此始终抱以高度认
为全面提升太湖流域饮用水安全保障能力,“十一五”水专项在无锡、苏州、嘉兴、上海等城市开展了系统的技术研发与工程示范应用,“十二五”期间同时兼顾考虑了吴江、宜兴和湖
期刊
由中铁苏局和隧道局共同承建的关角隧道平均海拔3500米,全长32.6公里,是目前世界在建最长的高原铁路隧道。科技含量高,工艺先进建设者们奋力拼搏,攻难克险,工程项目快速有序
在21世纪,自主学习习惯的养成不仅能够提高学生的探究能力和创新意识,而且,对学生社会竞争能力的提高也起着非常重要的作用。那么,在语文教学过程中,我们该如何培养学生的自