党的十一届三中全会以来随着改革开放的浪潮,我直接参与并负责了我国水电第一个引进外资的项目——鲁布革水电站的施工。鲁布革电站1988年12月27日第一台机组投产发电后,我即带着鲁布革管理经验的收获,带领我局二千多名职工奔赴广州抽水蓄能电站,进行了更深层次的改革,志在探索一条中国水电建设快速施工的新路子。一、广州抽水蓄能电站建设的基本情况广州抽水蓄能电站是国家重点工程。电站采用上水库、下水库、引水隧洞(斜井)及地
Since the Third Plenary Session of the Eleventh Central Committee of the Party, with the wave of reform and opening up, I have directly participated in and took charge of the construction of the Lubuge hydropower station, the first hydropower project in China. After the first unit was put into operation on December 27, 1988, Lubuge Power Station took power, and I took Lubuge’s management experience to gain more than 2,000 employees from the Bureau to the Guangzhou pumped-storage power station for a deeper level. The reform aims to explore a new way of rapid construction of China’s hydropower construction. I. Basic conditions for the construction of pumped storage power stations in Guangzhou The Guangzhou Pumped Storage Power Station is a national key project. The power station uses the upper reservoir, lower reservoir, diversion tunnel (decantation shaft) and ground