介绍了对岩土力学问题的管理如何对大型基础设施工程规划、设计以及施工产生重大影响。强调了在工程的整个使用期限内,用整体方法代替有关离散元素(如现场勘探、仪表设备以及现场监测)来研究岩土力学连续性的必要性。鼓励采用能够促进风险分担的合同格式,施工与设计期间采用更灵活的方法来评价与地基条件有关的不确定性。通过引证积累的经验及其他典型实例,还强调了从观测、施工数据解释与文件编制中如何为未来的工程积累重要的经验。
Introduced how the management of geotechnical problems had a significant impact on the planning, design and construction of large-scale infrastructure projects. The need to study the continuity of geotechnical mechanics in place of discrete elements such as on-site surveys, instrumentation and on-site monitoring has been emphasized throughout the life of the project. Encourage the adoption of contractual formats that promote risk sharing and a more flexible approach during construction and design to assess the uncertainty associated with foundation conditions. By citing accumulated experience and other typical examples, emphasis is also placed on accumulating important lessons for future projects from observations, interpretation of construction data and documentation.