水煤浆(CWM)目前已在世界上许多地方进行生产及试验。流体碳公司(Fluidcarbon)水煤浆厂是世界上第一个大规模商业化的水煤浆厂。这个厂是由萨拉国际公司(Sala International)和流体碳公司共同设计、建造的。工厂的布置和生产工艺是经过周密规划的。萨拉公司制造及提供生产设备,并负责工厂试生产。工厂的基础工程、建筑和安装由斯堪斯卡公司(Skanska)负责承担。水煤浆生产工艺主要有四步:磨碎、洗煤、脱水和调浆。磨碎:原煤在破碎段,破碎、筛分至一12mm。破碎后的煤贮存在1000m~3缓冲煤仓中。该仓容量可供35h工作的给料。所以,破
CWM is currently produced and tested in many parts of the world. Fluid Carbon The CWS is the world’s first large-scale commercial CWS plant. The plant was designed and built by Sala International and Fluid Carbon. The factory layout and production process is well planned. Sarah manufactures and supplies production equipment and is in charge of factory trial production. The foundations, construction and installation of the factory are the responsibility of Skanska. Coal-water slurry production process has four main steps: grinding, coal washing, dehydration and mixing. Grating: Raw coal in the broken section, broken, sieved to a 12mm. Shredded coal is stored in a 1000m ~ 3 bunker bunker. The warehouse capacity 35h work for the feed. So, broken