【摘要】伴随社会经济发展,人口的不断增长以及土地资源的紧缺,高层建筑已成为时代主流,高层建筑工程施工技术是完成高层建筑建设,保证高层建筑质量的重点,本文對高层建筑施工的特点进行简单论述、进而对高层建筑施工技术进行分析,通过实例探讨研究高层建筑施工技术创新,从而促进高层建筑工程发展。
【关键词】高层建筑工程;施工技术;工程施工
【Abstract】With the socio-economic development, population growth and shortage of land resources, high-rise buildings have become the mainstream of the times. High-rise building construction technology is the key to complete the high-rise building construction and ensure the high-rise building quality. This article briefly discusses the features of high-rise building construction , Then analyzes the construction technology of high-rise building, and explores the technical innovation of high-rise building construction through examples to promote the development of high-rise building.
【Key words】High-rise building construction;Construction technology;Construction
1. 前言:
城市建设是我国社会建设的主要内容之一,面对当下发展形势,低层建筑已经无法满足人们的生活及工作需要,高层建筑需求度逐渐提升,成为城市建设的重点。高层建筑层数高且结构分明,施工技术层次较高,同时也存在一些弱点,这需要不断完善并促进发展,突出高层建筑施工技术的重要性,强化建筑结构、施工技术,保障质量的同时优化技术,促进建筑业发展。
2. 高层建筑施工特点
高层建筑项目工程的施工特点是决定其特殊性的要素,想要做好对高层建筑施工技术的分析,就必须要先掌握高层建筑工程的施工特点。高层建筑工程施工特点主要表现在以下几个方面:
2.1工程量较大。
高层建筑主要特点就是体积大,这就决定了高层建筑的工程量,对于有限的施工周期来完成极大量的施工任务,必须要依靠大量的工程施工人员以及施工设备。除了在建筑施工过程中的施工量较大,高层建筑在设计阶段的工程量也不小。由于高层建筑高度这一特点,在进行设计高层建筑时,要充分考虑建筑的安全性、稳定性等内容。在多方面因素的影响下,设计人员务必要做到系统、准确且全面,才能保证高层建筑的设计质量、功能性都能够达到要求,所以说高层建筑具有工程量较大的特点。
2.2埋置深度大。
高层建筑的稳定性是建筑质量的主要问题之一,尤其是在风速较大的地区。为保证高层建筑整体结构的稳定性,埋置深度需要得到保障,地基埋置深度一般要大于建筑高度的十二分之一,对于桩基要大于建筑高度的十五分之一,并至少有一层地下室。
2.3施工工期长。
相比于平层、多层建筑的施工行为来说,高层建筑具有层数高、体积大的特点,在同等施工难度下,体积大的施工项目的施工周期必然要更长。另外,相比与平层、多层建筑的施工行为来说,高层建筑所具有的高度特点,使其施工难度明显增大,而且是成倍增长。在这种工程特点下,高层建筑的施工周期也就必然会比多层、平层建筑周期要长。在施工过程中,施工企业为了在保证施工质量的基础上追赶工期,其必须要抽出一定时间对高层建筑的质量安全进行检测、完善,基至有时还必须要边设计、边施工、边完善,即使这样高层建筑仍需极长的施工周期才能完成有效建设。
3. 高层建筑施工技术分析
3.1基础施工技术。
一般高层建筑的建设地点都是城市建筑比较密集的地方,因而导致施工现场
空间相对狭窄,基础埋置深度较大,在施工过程中首先要合理确定高层建筑的埋
深大小。在高层建筑的技术施工技术中,主要是根据高层建筑特点采用十字交叉
条形基础、桩基础、筏板基础、箱型基础等类型,且地下室一般要建成3~4层。
3.2混凝土工程施工技术。
高层建筑的混凝土工程施工要注意对混凝土质量的检验,而混凝土质量检验
指标主要是抗压强度,抗压强度主要有水量和水泥共同决定,一般高标号的水泥所配置的强度更高,因而在混凝土工程施工中药对水泥的标号进行核查,严格避免出现水泥标号错误情况。
3.3结构转换层施工技术。
高层建筑上部结构对轴线布置的空间要求小,而对下部分的轴线布置空间要
求大,这与建筑结构设置要求正好相反,导致了结构布置与功能之间的矛盾,因而要采用反常规的防治进行布置,也就是在结构转换的楼层设置转换层。在转换层结构中,剪力墙高度会影响结构抗震性能,要尽量限制转换层的高度,也就是说,转换层高度不能无限制地采用大的高度。
3.4后浇带施工技术。
高层建筑的施工后浇带是预留在主楼与裙房之间的,在实际的高程建筑工程
中,一般主楼都与裙房连在一起,且连接形式是裙房围绕主楼的周围。但主楼与裙房在施工中必须用变形缝分开,以保证沉降差的限度。而变形缝的设置会导致建筑平面布局的变动,为了弥补这一缺陷需要建设施工后浇带。对于主楼与裙房之间的梁板也需要留出施工后浇带,主楼结构完工后要用膨胀的混凝土将其浇筑起来,达到减小沉降差的目标。 3.5电气工程施工技术。
高层建筑的电气施工技术主要包括变电系统、自动报警系统、照明系统、防雷接地系统和通信系统。在照明系统中,要注意对楼道、走廊、地下车库等临时用电场所预留照明设施位置,并做好事前控制来保证照明效果和照明安全,特别要注意线路的走向设计,保证线路安全并尽量减小其对楼层外观的影响。高层建筑工程的防雷接地工程至关重要,因为高层建筑一般是地区最高的物体,也是雷击的主要目标,因而要进行对防雷设施的设计。
4. 高层建筑施工技术创新及实例
4.1工程概况。
上海环球金融中心地上101层,建筑高度492m,是世界最高建筑之一,也是目前国内最高标准智能建筑,其施工技术、建筑质量均需达到世界先进水平。其工程造型独特,变截面多,建筑物垂直偏差控制极为重要。在不断地研究与完善中,为了取得良好的经济效益,因而采用了许多新的先进的施工工艺,亦为今后类似的施工提供一些可以借鉴的施工方法。
4.2裙房逆作法施工。
裙房区地下室首层楼板先施工,为了保证出土工作的顺利进行,减少挖机转土次数,提高工作效率,需要对取土口进行合理的设置。取土洞口确定原则:根据现场环境,按对主体结构使用功能影响和水平运输通道的距离选定一个或多个出土口,并在地下室各层结构预留垂直运输施工孔洞,同时利用地下室车道作出土口,出土口多少根据整个工程的平面划分和竖向施工来进行设置。
4.3结构转换层施工。
按标准层施工方法,采用钢平台系统将核心筒墙体施工至转换区域,再将转换区域钢平台系统下挂脚手固定在核心筒墙体上。同时利用原钢平台系统下挂脚手作为操作脚手架,在新增墙休底部、新增墙体和原墙体之间安装钢结构支撑朽架,以作为核心筒转换区域墙体及楼板施工的临时操作平台。
4.4预制组合立管施工。
预制组合立管施工工艺在日本已广泛应用,但在中国尚属首次应用,具有现场施工简单、质量可靠、制作精度高等特点。采用该工艺对于管道集中布置的管井及现场施工作业面狭窄的高层建筑的机电工程施工,可节省塔吊作业时间并减少现场作业人员数量。对预制组合立管的制作与安装进行技术总结,形成了一套固定的施工工艺。
5. 总结:
综上所述,高层建筑工程是一項较为复杂的工程,要加强高层建筑施工质量,必须要注重高层建筑工程项目施工的过程,清楚认识高层建筑特征,对高层建筑工程的现状要有一定的了解,应用有效的技术方法对高层建筑施工技术不断创新,保障高层建筑的质量,促进高层建筑行业不断发展。
参考文献
[1]刘爱群.试论高层建筑施工技术及应用[J].城市建设理论研究,2012(20).
[2]郑光荣.高层建筑施工技术的发展分析[J].中华民居,2011(9).
[3]龚明.现代都市高层建筑工程施工技术探析[J].商品与质童,2012(2).
[4]张金龙.关于高层建筑施工技术的探讨[J].城市建设理论研究,2012(12).
[5]蔡少桃.高层建筑工程施工技术探析[J]. 广东科技,2012,11:256.
[6]苏永平.高层建筑工程施工技术要点分析[J]. 山西建筑,2014,11:126~128.
[7]李德志.浅谈高层建筑工程施工技术[J]. 民营科技,2015,03:181.
【关键词】高层建筑工程;施工技术;工程施工
【Abstract】With the socio-economic development, population growth and shortage of land resources, high-rise buildings have become the mainstream of the times. High-rise building construction technology is the key to complete the high-rise building construction and ensure the high-rise building quality. This article briefly discusses the features of high-rise building construction , Then analyzes the construction technology of high-rise building, and explores the technical innovation of high-rise building construction through examples to promote the development of high-rise building.
【Key words】High-rise building construction;Construction technology;Construction
1. 前言:
城市建设是我国社会建设的主要内容之一,面对当下发展形势,低层建筑已经无法满足人们的生活及工作需要,高层建筑需求度逐渐提升,成为城市建设的重点。高层建筑层数高且结构分明,施工技术层次较高,同时也存在一些弱点,这需要不断完善并促进发展,突出高层建筑施工技术的重要性,强化建筑结构、施工技术,保障质量的同时优化技术,促进建筑业发展。
2. 高层建筑施工特点
高层建筑项目工程的施工特点是决定其特殊性的要素,想要做好对高层建筑施工技术的分析,就必须要先掌握高层建筑工程的施工特点。高层建筑工程施工特点主要表现在以下几个方面:
2.1工程量较大。
高层建筑主要特点就是体积大,这就决定了高层建筑的工程量,对于有限的施工周期来完成极大量的施工任务,必须要依靠大量的工程施工人员以及施工设备。除了在建筑施工过程中的施工量较大,高层建筑在设计阶段的工程量也不小。由于高层建筑高度这一特点,在进行设计高层建筑时,要充分考虑建筑的安全性、稳定性等内容。在多方面因素的影响下,设计人员务必要做到系统、准确且全面,才能保证高层建筑的设计质量、功能性都能够达到要求,所以说高层建筑具有工程量较大的特点。
2.2埋置深度大。
高层建筑的稳定性是建筑质量的主要问题之一,尤其是在风速较大的地区。为保证高层建筑整体结构的稳定性,埋置深度需要得到保障,地基埋置深度一般要大于建筑高度的十二分之一,对于桩基要大于建筑高度的十五分之一,并至少有一层地下室。
2.3施工工期长。
相比于平层、多层建筑的施工行为来说,高层建筑具有层数高、体积大的特点,在同等施工难度下,体积大的施工项目的施工周期必然要更长。另外,相比与平层、多层建筑的施工行为来说,高层建筑所具有的高度特点,使其施工难度明显增大,而且是成倍增长。在这种工程特点下,高层建筑的施工周期也就必然会比多层、平层建筑周期要长。在施工过程中,施工企业为了在保证施工质量的基础上追赶工期,其必须要抽出一定时间对高层建筑的质量安全进行检测、完善,基至有时还必须要边设计、边施工、边完善,即使这样高层建筑仍需极长的施工周期才能完成有效建设。
3. 高层建筑施工技术分析
3.1基础施工技术。
一般高层建筑的建设地点都是城市建筑比较密集的地方,因而导致施工现场
空间相对狭窄,基础埋置深度较大,在施工过程中首先要合理确定高层建筑的埋
深大小。在高层建筑的技术施工技术中,主要是根据高层建筑特点采用十字交叉
条形基础、桩基础、筏板基础、箱型基础等类型,且地下室一般要建成3~4层。
3.2混凝土工程施工技术。
高层建筑的混凝土工程施工要注意对混凝土质量的检验,而混凝土质量检验
指标主要是抗压强度,抗压强度主要有水量和水泥共同决定,一般高标号的水泥所配置的强度更高,因而在混凝土工程施工中药对水泥的标号进行核查,严格避免出现水泥标号错误情况。
3.3结构转换层施工技术。
高层建筑上部结构对轴线布置的空间要求小,而对下部分的轴线布置空间要
求大,这与建筑结构设置要求正好相反,导致了结构布置与功能之间的矛盾,因而要采用反常规的防治进行布置,也就是在结构转换的楼层设置转换层。在转换层结构中,剪力墙高度会影响结构抗震性能,要尽量限制转换层的高度,也就是说,转换层高度不能无限制地采用大的高度。
3.4后浇带施工技术。
高层建筑的施工后浇带是预留在主楼与裙房之间的,在实际的高程建筑工程
中,一般主楼都与裙房连在一起,且连接形式是裙房围绕主楼的周围。但主楼与裙房在施工中必须用变形缝分开,以保证沉降差的限度。而变形缝的设置会导致建筑平面布局的变动,为了弥补这一缺陷需要建设施工后浇带。对于主楼与裙房之间的梁板也需要留出施工后浇带,主楼结构完工后要用膨胀的混凝土将其浇筑起来,达到减小沉降差的目标。 3.5电气工程施工技术。
高层建筑的电气施工技术主要包括变电系统、自动报警系统、照明系统、防雷接地系统和通信系统。在照明系统中,要注意对楼道、走廊、地下车库等临时用电场所预留照明设施位置,并做好事前控制来保证照明效果和照明安全,特别要注意线路的走向设计,保证线路安全并尽量减小其对楼层外观的影响。高层建筑工程的防雷接地工程至关重要,因为高层建筑一般是地区最高的物体,也是雷击的主要目标,因而要进行对防雷设施的设计。
4. 高层建筑施工技术创新及实例
4.1工程概况。
上海环球金融中心地上101层,建筑高度492m,是世界最高建筑之一,也是目前国内最高标准智能建筑,其施工技术、建筑质量均需达到世界先进水平。其工程造型独特,变截面多,建筑物垂直偏差控制极为重要。在不断地研究与完善中,为了取得良好的经济效益,因而采用了许多新的先进的施工工艺,亦为今后类似的施工提供一些可以借鉴的施工方法。
4.2裙房逆作法施工。
裙房区地下室首层楼板先施工,为了保证出土工作的顺利进行,减少挖机转土次数,提高工作效率,需要对取土口进行合理的设置。取土洞口确定原则:根据现场环境,按对主体结构使用功能影响和水平运输通道的距离选定一个或多个出土口,并在地下室各层结构预留垂直运输施工孔洞,同时利用地下室车道作出土口,出土口多少根据整个工程的平面划分和竖向施工来进行设置。
4.3结构转换层施工。
按标准层施工方法,采用钢平台系统将核心筒墙体施工至转换区域,再将转换区域钢平台系统下挂脚手固定在核心筒墙体上。同时利用原钢平台系统下挂脚手作为操作脚手架,在新增墙休底部、新增墙体和原墙体之间安装钢结构支撑朽架,以作为核心筒转换区域墙体及楼板施工的临时操作平台。
4.4预制组合立管施工。
预制组合立管施工工艺在日本已广泛应用,但在中国尚属首次应用,具有现场施工简单、质量可靠、制作精度高等特点。采用该工艺对于管道集中布置的管井及现场施工作业面狭窄的高层建筑的机电工程施工,可节省塔吊作业时间并减少现场作业人员数量。对预制组合立管的制作与安装进行技术总结,形成了一套固定的施工工艺。
5. 总结:
综上所述,高层建筑工程是一項较为复杂的工程,要加强高层建筑施工质量,必须要注重高层建筑工程项目施工的过程,清楚认识高层建筑特征,对高层建筑工程的现状要有一定的了解,应用有效的技术方法对高层建筑施工技术不断创新,保障高层建筑的质量,促进高层建筑行业不断发展。
参考文献
[1]刘爱群.试论高层建筑施工技术及应用[J].城市建设理论研究,2012(20).
[2]郑光荣.高层建筑施工技术的发展分析[J].中华民居,2011(9).
[3]龚明.现代都市高层建筑工程施工技术探析[J].商品与质童,2012(2).
[4]张金龙.关于高层建筑施工技术的探讨[J].城市建设理论研究,2012(12).
[5]蔡少桃.高层建筑工程施工技术探析[J]. 广东科技,2012,11:256.
[6]苏永平.高层建筑工程施工技术要点分析[J]. 山西建筑,2014,11:126~128.
[7]李德志.浅谈高层建筑工程施工技术[J]. 民营科技,2015,03:181.