论文部分内容阅读
隔河岩电厂计算机监测监控系统完全取代常规控制设备,在大型水电站成功投入运行。本文针对隔河岩计算机监控系统实际运行经验,作了简要的总结,就监控系统投运后对电厂的安全效益、经济效益及对电网的稳定效益进行了分析,并对隔河岩引进计算机监控系统在电厂实际运行中存在的问题及所进行的技术改造工作作了介绍。
Geheyan power plant computer monitoring and control system completely replace the conventional control equipment in the successful operation of large hydropower stations. This paper gives a brief summary of the actual operation experience of Geheyan computer monitoring system, analyzes the safety benefit, economic benefit and stability benefit of the power plant after it is put into operation, and introduces the computer monitoring System in the actual operation of the power plant problems and the technical transformation made by the introduction.