分析和研究广州市轨道交通3号线市桥站南端基坑变形实测结果,及时在后续基坑开挖中调整开挖方案,采取改进措施,有效控制了基坑变形。
Analysis and study of the deformation of the foundation pit at the south end of Guangzhou Metro Line 3 at Shiqiao Station, and timely adjustment of the excavation program in the follow-up foundation pit excavation. The improvement measures are taken to effectively control the deformation of the foundation pit.