Performance characteristics of tunnel boring machine in basalt and pyroclastic rocks of Deccan traps

来源 :Journal of Rock Mechanics and Geotechnical Engineering | 被引量 : 0次 | 上传用户:leninho
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
A12.24km long tunnel between Maroshi and Ruparel College is being excavated by tunnel boring machine(TBM)to improve the water supply system of Greater Mumbai,India.In this paper,attempt has been made to establish the relationship between various litho-units of Deccan traps,stability of tunnel and TBM performances during the construction of5.83km long tunnel between Maroshi and Vakola.The Maroshi–Vakola tunnel passes under the Mumbai Airport and crosses both runways with an overburden cover of around70m.The tunneling work was carried out without disturbance to the ground.The rock types encountered during excavation arefine compacted basalt,porphyritic basalt,amygdaloidal basalt pyroclastic rocks with layers of red boles and intertrappean beds consisting of various types of shales Relations between rock mass properties,physico-mechanical properties,TBM specifications and the cor responding TBM performance were established.A number of support systems installed in the tunne during excavation were also discussed.The aim of this paper is to establish,with appropriate accuracy the nature of subsurface rock mass condition and to study how it will react to or behave during under ground excavation by TBM.The experiences gained from this project will increase the ability to cope with unexpected ground conditions during tunneling using TBM. A12.24km long tunnel between Maroshi and Ruparel College is being excavated by tunnel boring machine (TBM) to improve the water supply system of Greater Mumbai, India. This paper, attempt has been made to establish the relationship between various litho-units of Deccan traps, stability of tunnel and TBM performances during the construction of 5.83 km long tunnel between Maroshi and Vakola. The Maroshi-Vakola tunnel passes under the Mumbai Airport and crosses both runways with an overburden cover of around 70m. The tunneling work was carried out without disturbance to the ground. The rock types encountered during excavation arefine compacted basalt, porphyritic basalt, amygdaloidal basalt pyroclastic rocks with layers of red boles and intertrappean beds consisting of various types of shales Relations between rock mass properties, physico-mechanical properties, TBM specifications and the cor responding TBM performance were established. A number of support systems installed in the tunne during excava tion was also discussed.The aim of this paper is to establish, with appropriate accuracy the nature of subsurface rock mass condition and to study how it will react to or behave during under ground excavation by TBM. ability to cope with unexpected ground conditions during tunneling using TBM.
其他文献
第四届茅盾文学奖榜首得主王火,本名王洪溥,原籍江苏如东,1924年出生于上海,1948年毕业于复旦大学新闻系。我与这位当代著名作家的认识,先是读了他的许多作品然后通信,神交多
有言道:夏来南湖,风动荷香;秋来南湖,天高水澄;冬临南湖,长堤残雪;春来南湖,绿柳绕堤。我们择深冬的午后,走进宏村的南湖,不见澄水、残雪,只有枯柳、残荷,还有一位中年妇人穿
为在设计过程中对粒料基层永久变形指标进行控制,以安定理论为指导,利用室内重复荷载三轴试验,对其永久变形设计指标与控制模型进行研究。通过对不同等级公路162种典型路面结
圣塔布兰卡电站在设计和施工经历了差不多 4 0a之后 ,1999年 5月投入运行 ,南帕拉伊巴河水能开发计划最终成为现实。 After nearly 40 days of design and construction, th
1 工程概况洪山水库位于信阳市平桥区龙井乡黄台寺,淮河支流大湖沟上游,控制流域面积2582hm~2,设计总库容1798万m~3,是一座以防洪、灌溉为主,并结合养殖等综合效益的中型水
知名度际平知名度是个当今很令人羡慕的词。在不耻于谈利已经司空见惯的社会和经济环境中,名气、名人、名牌都是很有经济效益的东西。电视上请名人作广告词说付费都在6位数以上
2004年10月2日晨7时许,刮了一夜的大风似乎还没有停下来的意思,气温骤然下降了十度。当人们还躺在温暖的被窝中酣睡时,在地坛公园书市地安门邮局的摊位前,几个大汗淋漓的人正在忙
一个人走遍千山万水,仍然可能有一天被不期而遇的风景惊呆。面对这个活在独特的历史和信仰中的国度,外来者除了惊叹,还是惊叹。 A person traveled thousands of miles, may
过去几年来,碳化硅(SiC)型功率半导体解决方案的使用情形大幅成长,成为各界仰赖的革命性发展。推动此项市场发展的力量包括下列趋势:节能、缩减体积、系统整合及提升可靠性。
近几年,不少的老战友和老朋友纷纷对我说:“黄教练,现在中国的跳高水平越来越低,你作为一名老一代跳高教练员的代表应该出来说说话,起码把你过去的训练经验介绍给大家,对年轻