目的通过对某锅炉厂搬迁新建工业X射线探伤室工程项目的放射防护控制效果评价,以保障放射工作人员、公众及其后代的健康与安全。方法利用现场调查资料、现场检测结果和该厂提供的相关材料,进行分析评价。结果该工业X射线探伤机房的选址、设计相对比较合理,符合放射防护的要求。结论本项目的放射防护设施布置基本可以满足放射卫生学要求;本项目的 X射线危害防护设施达到了竣工验收的基本要求,但对存在的问题应进行改进。
Objective To evaluate the radiological control effect of the project of relocating a new industrial X-ray detection room in a boiler factory to ensure the health and safety of radiation workers, the public and their descendants. Methods The on-site survey data, on-site test results and related materials provided by the factory were used for analysis and evaluation. Results The site selection and design of the industrial X-ray flaw detection room were relatively reasonable and meet the requirements of radiation protection. Conclusion The layout of radiological protection facilities in this project can basically meet the requirements of radiation hygiene. The X-ray hazard protection facilities of this project have met the basic requirements of completion and acceptance, but the existing problems should be improved.