随着建设工程施工项目的不断增多,建设工程施工过程中产生的合同索赔纠纷也越来越多。建设工程施工合同索赔时效的存在有利于工程索赔纠纷更加公平的解决。工程索赔时效是类似于诉讼时效的制度,但具有除斥期间属性。工程索赔时效能够平衡建设工程施工合同双方的利益,平衡双方的举证责任,如何计算建设工程施工合同索赔时效,将对帮助建设工程施工合同索赔时效更好地发挥其功能具有重要意义。
With the continuous increase of construction projects, there are more and more contract disputes arising from the construction of construction projects. The existence of the limitation of validity of the construction project construction contract is more conducive to a more fair settlement of disputes over project claims. Engineering claims timeliness is similar to the system of limitation of action, but with the exception of the property during the period. The limitation of the project claims can balance the interests of both parties to the construction contract, balance the burden of proof between the two parties and how to calculate the limitation of the construction contract. It will be of great significance to help the construction contract claim to perform its functions better.