论文部分内容阅读
城市中的无线网络经历了多年的发展,如今其覆盖深度、广度也在不断加强,站点建设密度越来越大,机房、站点的租赁成为网络建设一个难点。以往传统建设方式会面临例如无合适机房、租金较高、遇到阻碍等诸多困难。同时,相应采用传统的全套室内交、直流电源设备以及配套设备的建设及运营成本也较高。文章对一体化mini机房、室外一体化开关电源、远供电等方式进行简单的对比分析,目的是能够在实际建设中依据实际情况采用适当的方式以节约建设投资并缩短建设周期。
The city’s wireless network has experienced years of development, and now its depth of coverage, breadth is also constantly increasing, increasing the site construction density, engine room, site leasing has become a difficult network construction. In the past, the traditional way of construction would face many difficulties such as lack of a suitable engine room, higher rent and obstacles. At the same time, the corresponding use of the traditional full set of indoor AC and DC power supply equipment and ancillary equipment construction and operating costs are higher. The article makes a simple comparison and analysis on the integrated mini computer room, outdoor integrated switching power supply, and remote power supply. The purpose is to be able to use appropriate methods in actual construction to save construction investment and shorten the construction period.