论文部分内容阅读
文详细的论证了黄河三盛公水文实验站总(三)站的迁站原因,具体迁站步骤,以及进行自动化测流系统的改造。
This paper demonstrates in detail the reason why the general station (III) station of Yellow River Shengsheng public hydrological experimental station is relocated, the specific relocation steps and the reconstruction of the automatic flow measurement system.