水布垭水电站引水发电系统洞室地质条件复杂 ,需解决的技术问题较多 ,通过分析引水隧洞、主厂房、尾水洞开挖与支护的施工难点 ,提出了相应的处理措施及相关施工程序。初步探讨了主厂房的支护形式 ,其中许多技术措施有待结合工程实际进行进一步的调整和优化。
The geological conditions of the caverns of Shuibuya Hydropower Station diversion system are complex and there are many technical problems to be solved. Based on the analysis of construction difficulties of excavation and support of diversion tunnel, main plant and tailrace tunnel, the corresponding treatment measures and relevant construction procedures are put forward . Preliminary discussion of the main plant support form, many of which technical measures to be combined with the actual project to further adjust and optimize.