论文部分内容阅读
为了确保伊朗卡仑I水电站机组甩负荷的安全,对具有上、下游调压室、一管两机布置的复杂引水管路系统进行了机组甩负荷过渡过程数值模拟计算,确定了合理的导叶关闭规律,将其作为机组设计和运行的依据。
In order to ensure the safety of rejection load of Iran’s Kalun I hydropower station, the numerical simulation of the load transfer process was carried out on complex diversion pipeline system with upstream and downstream surge chambers and one pipe and two machines. The reasonable guide vanes Close the law as a basis for the design and operation of the unit.