一九八六年我省冬季农村水利建设,自十月上旬开始,截止十二月底两个多月来取得了丰硕成果,共完成土石方工程量4480多万立方米,混凝土方量29万多立方米,修复和整修清淤渠道29500公里,新修渠道2240公里,修复和更新改造水工建筑物20700座,新修12069座修复改造机井7826眼,新打964跟,配套1742眼,修复和更新改造抽水站1021座,新建141座,水库除险加固112座,整修加固河堤364公里,新建鱼池7564亩,灌区平整土地16万多亩,兴修无水利设施基本农田23.38万亩,恢复灌溉面积46.4万亩,
In 1986, the winter rural water conservancy construction in our province started in early October and achieved fruitful results in more than two months till the end of December. The total volume of earthwork and stonework reached 44.8 million cubic meters and the concrete volume was more than 290,000 cubic meters Meters, 29500 kilometers of dredging channels for repair and renovation, 2240 kilometers of newly-repaired channels, and 20,700 hydraulic structures for renovation and renovation, and a total of 11,869 wells for reconstructed and modified wells, covering 7,826 holes, 964 new holes and 1,742 holes, repairing and updating Reconstruction pumping station 1021, the new 141, reservoir reinforcement 112, renovation and reinforcement of embankment 364 kilometers, 7564 acres of new fish ponds, irrigation area formation of more than 160,000 acres of land, water conservancy facilities to build 233800 acres of basic farmland, restoration of irrigation area 464,000 mu,