摘要:我国的水利建设处于快速发展的时期,水利工程施工的技术、工艺、材料和装备等方面都取得了瞩目的成就。在施工关键技术上取得了新的突破,防水在水利水下工程中占有很重要的地位。本文主要对水利工程渗水形成的原因进行了分析,论述了基础的防渗技术及堵漏防水施工、冬季施工中混凝土工程等施工方法。 可供同行参考借鉴。
关键词:水利工程; 防渗技术; 施工技术; 堵漏防水; 混凝土工程;
Abstract: Water conservancy construction of our country in rapid development, the period of the water conservancy project construction technology, process and material and equipment, and other aspects have made great achievements. In the construction of the key technology to obtain the new breakthrough, waterproof in water conservancy underwater engineering occupies a very important position. This paper focuses on the causes of the formation of seepage water conservancy project, and discussed the basic seepage control technology and its waterproof construction, winter construction of concrete engineering construction method. It is vailable for peer for reference.
Key Words: Water conservancy projects; Impervious technology; Construction technology; Plugging waterproof; Concrete engineering
中图分类号:TU74 文献标识码:A 文章编号
前言
渗水一直是困扰着水利工程的难题,文章通过对水利工程渗水原因的分析,认为水利工程防渗是一项系统工程,提出了防渗措施以及对渗漏治理的施工方法。
一、渗水的形成原因分析
渗水的形成原因:
一是大面积渗水。一般大面积渗水发生在底板,主要原因是基面四周基坑降水应在垫层以下,达不到应有水平,造成排水不良,如遇雨天停电或出现其它机械故障,基坑水位上涨,淹没垫层,不具备灌注混凝土条件,为抢进度,带水施工。其次,在灌注混凝土过程中,由于拌合不均、振捣不密实等原因,造成混凝土孔隙大、强度低,出现大面积渗水现象。
二是施工缝。由于大面积施工,人为地将连续作业的混凝土分成几个单元,这个缝是施工造成的,是防水薄弱环节之一。施工时首先应清除施工缝面浮灰、杂物等清洗干净,再按规范有关规定施工。其次,模板支撑不牢、不严密,造成跑浆,出现蜂窝麻面,引起缝隙渗水。
三是变形缝。变形缝渗水主要的原因是止水带固定不牢,偏离中心,混凝土振捣不密实,出现较大孔洞或者蜂窝麻面。
四是穿墙管。在散滩电站水下工程有各种管(风、水、电)与主体工程联结,如止水环焊接不密实,在混凝土浇筑过程中,在施工困难处,混凝土振捣不密实,出现空洞或者蜂窝麻面,就往往出现渗水。
二、防水措施分析
防水措施在水利水下工程中很重要,它是一项综合技术的体现,是搞好工程施工的先决条件。在堵漏防水措施中,应抓好以下几个环节:
一是合理选择防水材料。近几年随着科学技术发展,新型防水材料类型较多,都有自己的特点,不是十全十美,只依靠材料解决各类渗水还有困难,应根据材料特点处理不同形式渗水。
二是堵防结合,刚柔结合。堵(水)是施工前提,把渗水渠道封闭,然后再采用防水措施不能单一处理,要综合治理,以利增强结构抗渗能力。我们在景电二期水下工程量中采用堵防结合施工方法。
三、堵漏防水施工方法分析
一是堵漏防水。①点渗水。结构基面局部出现点渗,应选择堵漏材料,一般混凝土结构基面涂刮刚性材料(RG 涂料确保时),当结构已有刚性材料防水层或水泥砂浆找平层的基面,可用柔性防水涂料,使渗水部位形成堵、涂、抹的防水层,增加结构抗渗性能。②渗水量大的处理时,我们在景电二期水下工程中,应划分几个单元,一个单元处理完后再处理另一个单元。根据单元渗水实际情况,对渗水量大的先埋管注浆,以防止注浆时跑浆。当渗水量小时,可采用堵的方法。这样经过多次堵注,抹几次循环,就解决了单元的问题,然后根据结构状况,涂抹刚性或柔性防水材料,增强结构抗渗性能。③ 变形缝渗水。变形缝渗水处理是“堵、注、嵌、涂、抹”综合处理施工方法。④施工缝渗水。施工缝处理时,以堵或注为主,把水堵住后,在施工缝中心线两侧范围,涂刮刚性的 RG 型材料,以增强结构抗渗性能。⑤基面微渗湿或夏季基面结露,应选择适用于潮湿基面的材料。在施工处理上,我们采用 RG 型防水涂料。这种材料的特点是只改变水灰比,既能堵漏又可以刮涂防水层,一料多用,满足了堵漏防水要求。
二是增强质量意识。①防水工程是一项系统工程,材料是基础,施工是关键,施工质量对防水工程起重要作用。实践证明,出现质量问题均与施工质量有关。为了提高工程质量,在施工必须建立工程质量保证体系,树立质量意识,在各个工序上严格把关,才能提高堵漏防水工程质量。②在施工过程中试验取得数据。堵漏材料型号较多,各有特点,要根据产品说明书去做,同时还应考虑影响其它胶凝的因素(气温、水灰比、加剂掺量、水泥品种等),必须进行试验,取得数据并掌握施工要领后方可施工。③涂刮刚性涂料。刚性防水涂料(确保时 RG 型)属于水泥基类,涂与刮只是改变涂刮厚度,增加抗渗性能,施工时,基面要求干净平整,有凹凸现象时,应填平压实,同时基面必须潮湿。湿度过小,容易使料粉粉化,过大又改变了涂料水灰比,降低涂刷厚度延长了胶凝化时间。涂刮几小时后,要喷水养护 3d,以利水化作用。④变形缝。变形缝是“堵、注、涂、抹”优化综合的体现。工序多,技术性强,各个环节一环扣一环,既连续又间断,整治后形成一个完整封闭的整体。其中有两点容易被人们忽视:1)缝中央要粘隔离层,使防水层与基面间形成隔离状态,以便应力扩散,同时又加宽了防水层变形幅度,使防水层避免产生过大变形应力,以利适应结构变形需要;2)最后工序抹水泥砂浆保护层,应在变形缝中央放置木板条,以防砂浆保护层产生不规则裂纹。⑤结构补强。防水层是依附在结构内部或基面上,如果结构强度不够,产生断裂,应进行分析检查结构是否应补强,然后才能做防水。否则,只做防水而不补强,结构继续发展后防水、补强会失败。
四、冬季施工工程技术分析
一是桩基工程。①施工前,应编制专项施工方案和技术措施。②桩基础的轴线引出的距离应适当增加,以免在打桩时受冻土硬壳层的影响。水准点的数量不应少于两个。③预制桩的混凝土的强度应达到设计强度标准值的 70%方可起吊,达到强度标准值的 100%方可运输和打桩。④桩的堆放应考虑到桩机的行进路线和打桩顺序,且桩的堆放层数应不超过 4 层。
二是混凝土工程。①混凝土的拌制。a、拌制混凝土用的骨料必须清洁,不得含有冰雪和冻块,以及易冻裂的物质。在掺有含钾、钠离子的外加剂时,不得使用活性骨料。在有条件的时候,砂石筛洗应抢在零上温度时做,并用塑料纸,油布盖好。b\拌制掺外加剂的混凝土时,如外加剂为粉剂,可按要求掺量直接撒在水泥上面和水泥同时投入。如外加剂为液体,使用时应先配制成规定浓度溶液,然后根据使用要求,用规定浓度溶液配制成施工溶液。各溶液要分别置于有明显标志的容器中,不得混淆。每班使用的外加剂溶液应一次配成。c、当施工期处于 0℃左右时,可在混凝土中添加早强剂,掺量应符合使用要求及规范规定,且应注意在添加前应做好模拟试验,以核实有关技术措施;对于有限期拆模要求的混凝土,还应适当提高混凝土设计等级。d、混凝土中添加防冻剂时,严禁使用高铝水泥。e严格控制混凝土水灰比,由骨料带入的水分及外加剂溶液中的水分均应从拌合水中扣除。f、搅拌掺有外加剂的混凝土时,搅拌时间应取常温搅拌时间的 1.5 倍。g、混凝土拌合物的出机温度不宜低于 10℃,入模温度不得低于 5℃。
②混凝土的运输与浇筑。混凝土的运输。a正确选择搅拌机摆放位置,尽量缩短运输距离,选择最佳运输路线,缩短运输时间;b正确选择运输容器的形式、大小和保温材料,装运拌合物用的容器应有保温防寒措施。混凝土的浇筑。a混凝土浇筑前,应清除模板和钢筋表面杂物,特别是新老混凝土(如梁、柱交接处)交接处的冰雪及垃圾,当环境气温低于-10℃时,采用暖棚法将直径大于 25mm 的钢筋加热至正温;b混凝土的灌注温度,在任何情况下均不低于 5℃,细薄截面混凝土结构的灌注温度不宜低于 10℃,混凝土分层连续灌注,中途不间断,每层灌注厚度不大于20cm,并采用机械捣固;c在浇筑时避免过振与漏振,不允許产生分层离析泌水现象,同时,现场应留设同条件养护的混凝土试块作为拆模依据。
参考文献
[1] 陈少巨.论水利工程施工技术[J].水利水电建设,2008.
关键词:水利工程; 防渗技术; 施工技术; 堵漏防水; 混凝土工程;
Abstract: Water conservancy construction of our country in rapid development, the period of the water conservancy project construction technology, process and material and equipment, and other aspects have made great achievements. In the construction of the key technology to obtain the new breakthrough, waterproof in water conservancy underwater engineering occupies a very important position. This paper focuses on the causes of the formation of seepage water conservancy project, and discussed the basic seepage control technology and its waterproof construction, winter construction of concrete engineering construction method. It is vailable for peer for reference.
Key Words: Water conservancy projects; Impervious technology; Construction technology; Plugging waterproof; Concrete engineering
中图分类号:TU74 文献标识码:A 文章编号
前言
渗水一直是困扰着水利工程的难题,文章通过对水利工程渗水原因的分析,认为水利工程防渗是一项系统工程,提出了防渗措施以及对渗漏治理的施工方法。
一、渗水的形成原因分析
渗水的形成原因:
一是大面积渗水。一般大面积渗水发生在底板,主要原因是基面四周基坑降水应在垫层以下,达不到应有水平,造成排水不良,如遇雨天停电或出现其它机械故障,基坑水位上涨,淹没垫层,不具备灌注混凝土条件,为抢进度,带水施工。其次,在灌注混凝土过程中,由于拌合不均、振捣不密实等原因,造成混凝土孔隙大、强度低,出现大面积渗水现象。
二是施工缝。由于大面积施工,人为地将连续作业的混凝土分成几个单元,这个缝是施工造成的,是防水薄弱环节之一。施工时首先应清除施工缝面浮灰、杂物等清洗干净,再按规范有关规定施工。其次,模板支撑不牢、不严密,造成跑浆,出现蜂窝麻面,引起缝隙渗水。
三是变形缝。变形缝渗水主要的原因是止水带固定不牢,偏离中心,混凝土振捣不密实,出现较大孔洞或者蜂窝麻面。
四是穿墙管。在散滩电站水下工程有各种管(风、水、电)与主体工程联结,如止水环焊接不密实,在混凝土浇筑过程中,在施工困难处,混凝土振捣不密实,出现空洞或者蜂窝麻面,就往往出现渗水。
二、防水措施分析
防水措施在水利水下工程中很重要,它是一项综合技术的体现,是搞好工程施工的先决条件。在堵漏防水措施中,应抓好以下几个环节:
一是合理选择防水材料。近几年随着科学技术发展,新型防水材料类型较多,都有自己的特点,不是十全十美,只依靠材料解决各类渗水还有困难,应根据材料特点处理不同形式渗水。
二是堵防结合,刚柔结合。堵(水)是施工前提,把渗水渠道封闭,然后再采用防水措施不能单一处理,要综合治理,以利增强结构抗渗能力。我们在景电二期水下工程量中采用堵防结合施工方法。
三、堵漏防水施工方法分析
一是堵漏防水。①点渗水。结构基面局部出现点渗,应选择堵漏材料,一般混凝土结构基面涂刮刚性材料(RG 涂料确保时),当结构已有刚性材料防水层或水泥砂浆找平层的基面,可用柔性防水涂料,使渗水部位形成堵、涂、抹的防水层,增加结构抗渗性能。②渗水量大的处理时,我们在景电二期水下工程中,应划分几个单元,一个单元处理完后再处理另一个单元。根据单元渗水实际情况,对渗水量大的先埋管注浆,以防止注浆时跑浆。当渗水量小时,可采用堵的方法。这样经过多次堵注,抹几次循环,就解决了单元的问题,然后根据结构状况,涂抹刚性或柔性防水材料,增强结构抗渗性能。③ 变形缝渗水。变形缝渗水处理是“堵、注、嵌、涂、抹”综合处理施工方法。④施工缝渗水。施工缝处理时,以堵或注为主,把水堵住后,在施工缝中心线两侧范围,涂刮刚性的 RG 型材料,以增强结构抗渗性能。⑤基面微渗湿或夏季基面结露,应选择适用于潮湿基面的材料。在施工处理上,我们采用 RG 型防水涂料。这种材料的特点是只改变水灰比,既能堵漏又可以刮涂防水层,一料多用,满足了堵漏防水要求。
二是增强质量意识。①防水工程是一项系统工程,材料是基础,施工是关键,施工质量对防水工程起重要作用。实践证明,出现质量问题均与施工质量有关。为了提高工程质量,在施工必须建立工程质量保证体系,树立质量意识,在各个工序上严格把关,才能提高堵漏防水工程质量。②在施工过程中试验取得数据。堵漏材料型号较多,各有特点,要根据产品说明书去做,同时还应考虑影响其它胶凝的因素(气温、水灰比、加剂掺量、水泥品种等),必须进行试验,取得数据并掌握施工要领后方可施工。③涂刮刚性涂料。刚性防水涂料(确保时 RG 型)属于水泥基类,涂与刮只是改变涂刮厚度,增加抗渗性能,施工时,基面要求干净平整,有凹凸现象时,应填平压实,同时基面必须潮湿。湿度过小,容易使料粉粉化,过大又改变了涂料水灰比,降低涂刷厚度延长了胶凝化时间。涂刮几小时后,要喷水养护 3d,以利水化作用。④变形缝。变形缝是“堵、注、涂、抹”优化综合的体现。工序多,技术性强,各个环节一环扣一环,既连续又间断,整治后形成一个完整封闭的整体。其中有两点容易被人们忽视:1)缝中央要粘隔离层,使防水层与基面间形成隔离状态,以便应力扩散,同时又加宽了防水层变形幅度,使防水层避免产生过大变形应力,以利适应结构变形需要;2)最后工序抹水泥砂浆保护层,应在变形缝中央放置木板条,以防砂浆保护层产生不规则裂纹。⑤结构补强。防水层是依附在结构内部或基面上,如果结构强度不够,产生断裂,应进行分析检查结构是否应补强,然后才能做防水。否则,只做防水而不补强,结构继续发展后防水、补强会失败。
四、冬季施工工程技术分析
一是桩基工程。①施工前,应编制专项施工方案和技术措施。②桩基础的轴线引出的距离应适当增加,以免在打桩时受冻土硬壳层的影响。水准点的数量不应少于两个。③预制桩的混凝土的强度应达到设计强度标准值的 70%方可起吊,达到强度标准值的 100%方可运输和打桩。④桩的堆放应考虑到桩机的行进路线和打桩顺序,且桩的堆放层数应不超过 4 层。
二是混凝土工程。①混凝土的拌制。a、拌制混凝土用的骨料必须清洁,不得含有冰雪和冻块,以及易冻裂的物质。在掺有含钾、钠离子的外加剂时,不得使用活性骨料。在有条件的时候,砂石筛洗应抢在零上温度时做,并用塑料纸,油布盖好。b\拌制掺外加剂的混凝土时,如外加剂为粉剂,可按要求掺量直接撒在水泥上面和水泥同时投入。如外加剂为液体,使用时应先配制成规定浓度溶液,然后根据使用要求,用规定浓度溶液配制成施工溶液。各溶液要分别置于有明显标志的容器中,不得混淆。每班使用的外加剂溶液应一次配成。c、当施工期处于 0℃左右时,可在混凝土中添加早强剂,掺量应符合使用要求及规范规定,且应注意在添加前应做好模拟试验,以核实有关技术措施;对于有限期拆模要求的混凝土,还应适当提高混凝土设计等级。d、混凝土中添加防冻剂时,严禁使用高铝水泥。e严格控制混凝土水灰比,由骨料带入的水分及外加剂溶液中的水分均应从拌合水中扣除。f、搅拌掺有外加剂的混凝土时,搅拌时间应取常温搅拌时间的 1.5 倍。g、混凝土拌合物的出机温度不宜低于 10℃,入模温度不得低于 5℃。
②混凝土的运输与浇筑。混凝土的运输。a正确选择搅拌机摆放位置,尽量缩短运输距离,选择最佳运输路线,缩短运输时间;b正确选择运输容器的形式、大小和保温材料,装运拌合物用的容器应有保温防寒措施。混凝土的浇筑。a混凝土浇筑前,应清除模板和钢筋表面杂物,特别是新老混凝土(如梁、柱交接处)交接处的冰雪及垃圾,当环境气温低于-10℃时,采用暖棚法将直径大于 25mm 的钢筋加热至正温;b混凝土的灌注温度,在任何情况下均不低于 5℃,细薄截面混凝土结构的灌注温度不宜低于 10℃,混凝土分层连续灌注,中途不间断,每层灌注厚度不大于20cm,并采用机械捣固;c在浇筑时避免过振与漏振,不允許产生分层离析泌水现象,同时,现场应留设同条件养护的混凝土试块作为拆模依据。