介绍了绍兴市热电厂 75t/h循环流化床锅炉炉膛底部燃烧室、分离器、辅机等的技术改造,及锅炉运行负荷提高20t/h,厂用电率降低31.5%,热效率提高2.53%的结果。图1表2参3。
The technological transformation of the combustion chamber, separator and auxiliary machine at the bottom of the furnace of 75t / h circulating fluidized bed boiler in Shaoxing City was introduced. The operation load of the boiler was increased by 20t / h, the electricity consumption decreased by 31.5% and the thermal efficiency increased by 2 .53% of the results. Figure 1 Table 2 Reference 3.