以科斯托穆克什铁矿床为基地,苏联西北地区最大的采选公司的首期建设工程已竣工,该矿床用露天方法开采。国立采矿工业设计院在编制采选公司的建设工程设计时,曾研究了不同的运输工艺流程,进行技术经济比较的结果,推荐了在露天采场内使用汽车运输的方案,同时在矿床开采时期内,矿石在露天采场边帮上转载给铁路运输,将原矿运给选矿厂,而岩石则用自卸汽车运到外部排土场。随着开采工程的降深,拟定采用箕斗提升机向转运站供矿;采用间断-连续工艺运输岩石,该工艺系统包括设在露天采场内的破碎装置,并且胶带运输机是设在露天采场边帮上。在对不同工艺流程方案进行比较时,研
The first phase of the construction of the largest mining and dressing company in the northwestern Soviet Union, completed on the basis of the Kostok Mukesh iron deposit, has been completed by opencast mining. In the course of compiling the construction design of the mining company, National Institute of Mining Industrial Design studied various transportation processes and compared technical and economic results. It recommended a plan for using motor transport in open pit mining. At the same time, during the mining period In the open pit, the ore was transferred to the railroad for transport, the ore was transported to the concentrator, and the rock was dumped to an external dump. With the deepening of the mining project, it is proposed to use the skip elevator to supply ore to the transfer station; the rock is transported by the discontinuous-continuous process, which includes the crushing device in the open pit and the belt conveyor is located in the open pit Field side to help. In the process of different programs to compare, research