论文部分内容阅读
通过对福州市某安置房工程预应力(管)桩基础的检测与分析,综合检测结果、地质报告及桩基施工情况,综合分析引起质量事故的原因,提出加固处理方案,经过试验检测,结果满足规范要求,起到了很好的加固效果,同时节约了成本,对类似工程有借鉴意义。
Through the detection and analysis of prestressed (pipe) pile foundations in a resettlement housing project in Fuzhou City, comprehensive test results, geological reports and pile foundation construction, comprehensive analysis of the causes of quality accidents, proposed reinforcement treatment program, after testing, the results Meet the specification requirements, played a very good reinforcement effect, while saving costs, for similar projects have reference.