这间新转炉车间于1980年12月15日投产。建设时间为19个月。第一期工程有两座140吨氧气顶吹转炉,钢包处理设备和三台方坯弧形连铸机。由于在设计中已预先作了考虑,将来转炉改用LBE法吹炼(顶底复合吹炼法中的一种)没有任何困难。转炉废气中的可燃部分将回收,并归入工厂热源网内。新转炉车间的产钢量可达13万吨/月。整个冶炼过程可用最
The new converter plant was put into operation on December 15, 1980. Construction time is 19 months. The first phase of the project has two 140 tons of oxygen top blowing converter, ladle processing equipment and three billet arc caster. Due to the design has been previously considered, in the future converter to use the LBE method blowing (top and bottom compound blowing method in a) without any difficulty. The combustible part of the converter exhaust gas will be recovered and placed in the plant heat source network. The new converter plant produces up to 130,000 tons of steel per month. The entire smelting process available